2. Installation instructions
ATTENTION!
The installation, electrical connection and first operation of this appliance should be carried out by a
qualified installer.
The company does not accept liability for failure of any goods supplied which have not been installed
and operated in accordance with the manufacturer's instructions.
This convector heater must be installed by an authorised serviceman in conjunction with these instructions.
These installation instructions belong to the heater and must be handed on to the successor if the heater is
sold.
AEG convector heaters are direct electric heaters designed to be mounted on the wall and are particularly
suitable for heating smaller rooms such as utility rooms, kitchen, bath- and washrooms etc.
The convector heater is supplied with a lead.
(Exception: WKL502 C to WKL3002 C)
The convector heater must not be mounted immediately
below a wall socket.
During the just operation, the heater may give off a smell.
Ensure that the room is ventilated (for example, open a
window).
2.1 Attaching the wall mounting bracket
The wall mounting bracket is oriented centrally
(see figure and the following table).
Use the wall-mounting bracket as a template for positioning the heater correctly and providing the correct
distance from the floor.
Place the bracket on the floor. Mark the screw-holes through the drill holes (j).
Type WKL WKL WKL WKL WKL WKL WKL
502 752 1002 1502 2002 2502 3002
Connecting power W 500 750 1000 1500 2000 2500 3000
Breadth mm 370 370 445 590 740 890 1036
Heigth mm 450 450 450 450 450 450 450
Depth mm 78 78 78 78 78 78 78
with wall mounting 100 100 100 100 100 100 100
Measure A 121 121 195 343 491 639 790
Weight kg 4.1 4.1 4.7 6.1 7.4 8.1 10.0
Raise the bracket and position it in such a way that holes B
are aligned with the marks on the wall you have just made.
Now mark the upper holes through holes C and D in the wall
mounting ( II ).
Drill the four holes, insert plugs and screw the wall mounting
securely to the wall using four screws.
2.2 Wall mounting the convector
On the backside of the convector there are 4 slots, these
should be hooked onto the wall bracket and pushed down.
The spring clips should be turned clockwise to secure.
To remove the convector reverse the above operation.
For the Professional
7

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für AEG WKL 1502 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info