21 Arada Farringdon 16
INSTALLATION
FINAL CHECK LIST
Before handing over the installation to the
customer it is recommended that the appliance is
lit and the functioning of the chimney system is
checked for satisfactory operation.
• Be sure that the chimney is operating
and ALL smoke and fumes are vented to
the atmosphere through the chimney
terminal.
• Check all joints and seals.
• Clean the outside of the appliance to
prevent any stains becoming burnt on.
• Check the flue draught which should
read 1.2—2mm, or 0.12—0.2 mbar.
• Explain the controls and operation of the
appliance to the customer.
The following details must be checked and
completed in full by the installer at the time of
installation. Please answer all questions as fully
as possible. Arada stoves cannot be held
responsible for the chimney or installation.
SUMMER STORAGE / NON
USAGE
Please ensure that your stove is left clean and
moving components are well lubricated for the
summer months (during periods of prolonged non
use). If possible store the throat plate outside of the
stove, check all moveable components, at regular
intervals, to ensure they are moving freely.
Allow air movement through the stove, by opening
the primary air inlet control to about half way open
or leave the door ajar. This will allow a free flow of
air through the appliance thus preventing moisture
and condensation
forming inside the stove and chimney. This
preventative maintenance will ensure your stove
stays in the best condition for the coming winter
months.