519989
20
Zoom out
Zoom in
Vorherige Seite
1/170
Nächste Seite
19
F
F
u
u
e
e
l
l
l
l
i
i
n
n
g
g
o
o
f
f
t
t
h
h
e
e
d
d
e
e
v
v
i
i
c
c
e
e
Stop the engine and allow it to cool down.
Wear protective gloves.
Avoid eye and skin contact.
Strictly follow the instructions under ”Safe
handling with fuels”.
 Clean the area around the filler neck. Contamination in the
tank may result in malfunction.
Â
Carefully open the tank cap (20) to allow possible
overpressure to relax.
 Shake the container once more before pouring the fuel
mixture into the tank.
 Carefully fill the fuel mixture up to the lower edge of the filler
neck. Avoid spilling of fuel or oil. Clean the device
immediately when you have spilled fuel or oil.
Make sure that no fuel can come into the soil.
 Carefully close the tank cap after fuelling and check that it
does not get loose during operation.
 Check that there is no leakage on the tank cap and fuel
lines. If there are leaks this product may not be started.
 Clean the tank cap and the area around it.
Go away at least three metres from the fuelling place to
start the chain saw.
S
S
t
t
a
a
r
r
t
t
-
-
u
u
p
p
Check that the machine is completely and correctly
assembled.
Before each use, check
the correct assembly of the drill
- the machine for possible damage
- loose fastenings
Â
Make sure that the ON/OFF switch, the throttle lock-out
switch, the throttle trigger and the machine properly work.
LThe engine of the machine is supplied without gasoline
and oil in it. Fuel the device as described under ”Fuelling”.
When starting make sure that the drill can freely rotate.
S
S
t
t
a
a
r
r
t
t
i
i
n
n
g
g
w
w
i
i
t
t
h
h
c
c
o
o
l
l
d
d
e
e
n
n
g
g
i
i
n
n
e
e
 Firmly press on the fuel pump (12) several times until
petrol (gasoline)/foam is visible in the priming pump.
 Put the choke lever (13) to OFF .
 Put the ON/OFF switch (10) to
.
 Press the throttle lock-out switch (8) and operate the throttle
trigger (9) at the same time.
Â
Lock the throttle lever using the locking pin (11).
Â
Grasp the cranking handle (14) and slowly pull the
cranking rope until a resistance is felt. Then, pull quickly
and firmly.
Do not fully pull out the cranking rope and slowly
guide the cranking handle back to make sure that
the cranking rope is correctly wound up.
Repeat this operation until the engine starts.
Â
Put the choke lever (13) halfway back when the engine
has started.
L
The engine will idle when you release the throttle
trigger.
Â
When the engine runs smoothly put the choke lever
(13) to ON.
 Allow the engine to warm up for 30 seconds before starting
your work.
S
S
t
t
o
o
p
p
p
p
i
i
n
n
g
g
t
t
h
h
e
e
e
e
n
n
g
g
i
i
n
n
e
e
 Release the throttle trigger (9).
Put the ON/OFF switch (10) to the position
.
S
S
t
t
a
a
r
r
t
t
i
i
n
n
g
g
w
w
i
i
t
t
h
h
w
w
a
a
r
r
m
m
e
e
n
n
g
g
i
i
n
n
e
e
Start the device as described under “Starting with cold engine”,
but leave the choke lever in its operating position ON and do
not operate the throttle trigger.
W
W
o
o
r
r
k
k
i
i
n
n
g
g
i
i
n
n
s
s
t
t
r
r
u
u
c
c
t
t
i
i
o
o
n
n
s
s
You may not start to operate the machine until you
have read these operating instructions, observed all the
instructions given and installed the machine as described!
W
W
o
o
r
r
k
k
i
i
n
n
g
g
w
w
i
i
t
t
h
h
t
t
h
h
e
e
e
e
a
a
r
r
t
t
h
h
a
a
u
u
g
g
e
e
r
r
Only use auger drills recommended by the manufacturer.
Pay attention to the max. diameter.
Put your feet shoulder-width apart and firmly grasp the earth
auger on both handles.
Start the drilling with "half throttle" and gradually increase
the speed so that the drill penetrates into the soil without
any problems.
Drill holes without exerting too much body weight on the
auger. Allow the auger to advance by its own weight.
If the auger drill is jammed in the soil and cannot be pulled
out, stop the engine and turn the earth auger
counterclockwisely.
The clutch may still slip during the run-in time of approx. 2
operating hours. Make sure that the clutch is free from oil or
moisture.
20

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Atika ELB 52 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Atika ELB 52

Atika ELB 52 Installationsanweisung - Deutsch, Englisch, Holländisch, Dänisch, Französisch, Italienisch, Polnisch - 6 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info