22. Burner connection for the D14P, D21P and D25P boilers
1. ATMOS 25 pellet burner 3. 2 x M8 screw
2. Sealing cord, 18 x 32 mm, small 4. 2x M8 decorative nut
23. Boiler system with an external storage container and conveyor
1. ATMOS D14P, D21P, D25P boiler 4. Pellet container (250, 500 and 1000 l)
2. ATMOS 25 pellet burner 5. Conveyor leg
3. ATMOS DA1500 conveyor - 1.5 m 6. Cleaning door
RECOMMENDATION - We recommend you to select the container size of 500 l to 1000
l, which will be sufficient for 3 to 14 days, depending on the consumed power. The larger
the volume of the container, the better. The length of the conveyor may be 1.5 m, 2.5 m or
2.5 m. As the pellet storage you can also use a clearly delimited part of the room complying
with fire regulations from which pellets may be drawn to an intermediate storage container
at the boiler, or directly to the boiler.