577300
7
Zoom out
Zoom in
Vorherige Seite
1/63
Nächste Seite
01/2014
DUSPOL
®
expert
7
atelybeforeandafterusingit!
Activation of the self-test:
• Short-circuittheprobetipsL1/-
2
and L2/+
3
.
• Pressandholdthepush-button
6
ofthedisplayhan-
dle L2
3
for approx. 3 seconds to start the self-test.
• The buzzersounds, all LEDs(except forthe -12V
LEDor+ 12VLED)
9
and the measuring point il-
lumination must be functioning.
- Replace the batteries, if the self-test cannot be activated
anymore.
- Test the voltage tester with familiar voltage sources, e.g.
witha230Vsocket.
- Do not use the voltage tester, if the voltage indication, the
phase indication and the vibration motor are not working
properly!
4. Checking the absence of voltage of an installation(g-
ure B/C)
For checking the installation, please test the absence of
voltagebycheckingthevoltageindication,thephaseindication
(the phase indication only works in an earthedAC voltage
mains) and the vibration motor (the vibration motor is activated
byactuatingbothpush-buttons).Theinstallationisonlyfree
of voltage, if all three test circuits (voltage indication, phase
indication and vibration motor) are signaling the absence of
voltage.
- ApplythetwoprobetipsL1/+
2
and L2/-
3
tothesystem
parts to be tested.
- Thelevelofvoltageappliedisindicatedbymeansofthe
LEDstepindicator
9
.
- AflashingLEDstepindicatesthatthevoltagevalueofthis
LED step hasnot been reached(except forLED 12V/
24V).ALEDstepwillstarttolightfrom75%to85%of
the step value onwards.
- Alternatingvoltages(AC)areindicatedbythe+12VLED
and the -12VLEDlightingupsimultaneously.
- Direct voltages (DC) are indicated by the + 12 V LED
orthe-12VLEDlighting up.Thepolarity indication
J
shows the polarity (+ or -) applied to the probe tip L2/+
3
.
- Todifferentiatebetweenlow-energyandhigh-energyvolt-
ages(e.g.capacitivelyinducedinterferencevoltages),an
internalloadinthevoltagetestercanbeconnectedbyac-
tuating both push-buttons (see section 5).
Overload indication
If the voltage applied to the probe tips L1/-
2
and L2/+
3
is higher than the admissible nominal voltage, all LEDs of
the step indicator
9
areashing.Overloadisindicatedfrom
1,100VAC/DCon.
5. Load connection with vibration motor (gureB/C)
Both handles L1
7
and L2
8
are equipped with push-buttons
6
.Here,voltage is appliedtoavibrationmotor(motor with
unbalancedmass)inthedisplayhandleL2
8
.
From approx. 200 V on, this motoris set in rotarymotion.
With the voltage increasing, the motor's speed and vibration
increases as well. The duration of the test with a lower inter-
nal resistance (load test) depends on the level of voltage to
be measured. In order to avoid an inadmissible warming of
the device, it is provided with a thermal protection (controlled
reduction). With this controlled reduction, the speed of the vi-
bration motor is reduced and the internal resistance increases.
The load connection (with both push-buttons being actuated)
can be used ...
- to suppress reactive voltages (inductive and capacitive
voltages),
- to charge capacitors,
- totrip10/30mAFIsafetyswitches.ThetrippingoftheFI
safety switch is done by testing the external conductor
(phaseindication)toPE(earth).(figureD)
6. External conductor test (phase indication)(gureD)
- FullygraspthehandlesL1
7
and L2
8
, in order to en-
sure a capacitive coupling to earth.
- ApplytheprobetipL2/+
3
tothesystemparttobetested.
During the single-pole external conductor test (phase in-
dication),makeabsolutelysurenottotouchtheprobetip
L1/-
2
and that it remains contactless.
- IftheredLED
K
lightsuponthedisplay,theexternal
conductor(phase)ofanACvoltageisappliedtothissys-
tem part.
Note:
The single-pole external conductor test (phase indication)
canbecarriedoutinanearthedmainsfrom230V,50/60Hz
(phase to earth) on. Protective clothing and insulating condi-
tions on site might impair the function.
Attention!
Theabsenceofvoltagecanonlybedeterminedbymeansof
a two-pole test.
7. Phase sequence test (gureF/G)
- FullygraspbothhandlesL1
7
and L2
8
, in order to en-
sure a capacitive coupling to earth.
- ApplytheprobetipsL1/-
2
and L2/+
3
to two external
conductors (phases) and check whether the external con-
ductorvoltageofe.g.400Visapplied.
- A clockwise phase sequence (phase L1 before phase L2)
isgiven,ifthegreenLED►ofthephasesequenceindica-
tion
L
lights up.
- A counter-clockwise phase sequence (phase L2 before
phaseL1)isgiven,ifthegreenLED◄ofthephasese-
quence indication
L
lights up.
- Thephasesequencetestalwaysrequiresacountercheck
with the probe tips L1/-
2
and L2/+
3
being inverted dur-
ing which the phase sequence must change.
Note:
The phase sequence test can be carried out in an earthed
three-phase mains from 230V - 900 V,50/60 Hz (phase to
7

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Benning Duspol Expert wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info