31
•
400 V 2N triphase hook-up
1166
-amp fuse.
Separate the two phase wires (L1 and L2)
before hooking up.
11
/ INSTALLING YOUR APPLIANCE
NNeeuuttrraall
GGrroouunndd
PPhhaassee
NN
LL
Green/yellow
Blue
Black
Brown
NNeeuuttrraall
GGrroouunndd
PPhhaassee 22
PPhhaassee 11
NN
LL11
LL22
Blue
Green/yellow
Black
Brown
•
220-240 V monophase hook-up
3322
-amp fuse.
Warning
If the power cable is damaged, it
should be replaced by the manufacturer, its
after-sales service department or by a
person with similar qualifications to avoid
danger.
For a 400 V 2N triphase hook-up, if your hob
malfunctions, check that the neutral
conductor is properly connected.
These hobs must be connected to the power
grid via an electrical outlet that complies with
EIC publication 60083 or an all-pole cut-off
device that complies with installation
regulations in effect.
When power is first supplied to your hob, or
after an extended power outage, an indicator
light will appear on the control panel. It
automatically disappears after approximately
30 seconds, or as soon as any touch control
on the control panel is pressed. This display is
normal and, if needed, serves as an indication
to the after-sales service staff. In all cases, the
user of the hob should disregard it.
HOOK-UP
••