780622
12
Zoom out
Zoom in
Vorherige Seite
1/52
Nächste Seite
Condens 7000 WP – 6721841195 (2022/01)
12
Installation
5.3 Water quality
Unsuitable or contaminated heating and tap water can lead to faults
in the boiler and can damage the heat exchanger or DHW supply
among other things due to sludge formation, corrosion or
calcification. Please get in touch with the manufacturer if you require
additional information on the water quality. You will find the relevant
addresses on the back of this document.
Using the supplied “Water quality operator's log” determine the water
volume Vmax:
If the amount of fill and top-up water is already greater than the
calculated water volume Vmax:
Use the water treatment as specified in the “Water quality operator's
log”.
If the amount of fill and top-up water is less than the calculated water
volume Vmax:
Purge and clean the heating system if required.
Only use untreated potable water.
Do not use chemical additives (e.g. inhibitors or agents that increase
or reduce the pH), apart from as specified in § 5.3.1.
5.3.1 Water conditioning and treatment
NOTICE
Damage to appliance due to sealing agent in the heating water.
Addition of sealing agent to the heating water is not permitted.
Conditioned water is water that has been softened or desalinated and to
which no chemicals have been added. Treated water is unconditioned or
conditioned water to which chemicals have been added.
The following water conditioning and water treatment measures have
been approved for use by Bosch:
Table 5 Additives
For information on concentrations and applications, contact the
supplier of the additive.
5.4 Maximum flow temperature
NOTICE
Too much chloride in the heating water can damage the appliance.
If the chloride content in the heating water exceeds 150 ppm, the
boiler may be damaged if the heating water temperature is higher than
80 °C. If the maximum flow temperature is set higher than 80 °C, the
water treatment must be adapted in order to reduce the chloride
content.
If the chloride content is more than 150 ppm, carry out a water
treatment as described in the supplied "Manual for water quality".
The boiler is supplied with a set maximum flow temperature of 80 °C as
standard. Under standard conditions, this maximum boiler temperature
is sufficient to cover the heating load and also guarantee the service
life of the boiler.
A higher maximum flow temperature may however be required for
certain installations. In these cases, the chloride content of the heating
water must be checked and reduced if necessary.
With the chloride content of the heating water.
If the chloride content is more than 150 ppm, perform water
treatment as described in the supplied "Manual for water quality".
Set the maximum flow temperature to the required value ( § 9.4.2,
p. 26).
Contact the manufacturer for more information. You will find the
relevant addresses on the back of this document.
6 Installation
WARNING
Risk of explosion
Close the gas valve before working on gas-carrying components.
After completing the work, check the tightness of all gas-carrying
components.
6.1 Unpacking the boiler
The packaging material is fully recyclable.
Dispose of the boiler packaging after installing the
boiler at a recycling point.
Remove the outer packaging by setting the boiler upright and pulling
it up and off.
Avoid damaging the connections on the boiler at the top and
bottom.
Cover the flue outlet adapter of the boiler during assembly.
6.2 Checking the gas type
Check whether the gas type to be connected to the appliance
corresponds to the gas type specified on the data plate. (§ 2.11,
p. 6 ).
6.3 Setting up the boiler The boiler can be
installed in two ways:
Installation on a frame (accessory).
Installation on the wall.
To make full use of the modular design of the system, it is advisable to
install the boiler in combination with the frame.
Installation on the frame (accessory)
WARNING
Physical injury due to tipping of the boiler.
The frame must be securely attached to the floor or wall so that the boiler
cannot tip over.
Use fixing materials that are suitable for the subsurface or wall and
offer a sufficient hold.
Fasten the frame to the floor with the bracket (included).
If drilling in the floor is not permitted fasten the frame to the wall.
Mount the cross bars [1] to the stands [2].
Secure the cross bars with the brackets [3] (included).
Place the frame at the required location in the installation room.
Application Product name Max.
concentration
[%]
Demineralisation Demineralisation/
desalination with mixed
bed cartridges
In accordance with
the supplied
"Manual for water
quality"
Inhibitor/antifreeze Fernox Alphi 11 40
Antifreeze Noburst AL 40
12

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Bosch Condens GC7000WP wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Bosch Condens GC7000WP

Bosch Condens GC7000WP Installationsanweisung - Deutsch - 60 seiten

Bosch Condens GC7000WP Bedienungsanleitung - Deutsch - 12 seiten

Bosch Condens GC7000WP Bedienungsanleitung - Englisch - 12 seiten

Bosch Condens GC7000WP Installationsanweisung - Holländisch - 56 seiten

Bosch Condens GC7000WP Bedienungsanleitung - Holländisch - 12 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info