697439
14
Zoom out
Zoom in
Vorherige Seite
1/40
Nächste Seite
14 | Mounting
Uni 3000 F6 720 812 900 (2014/10)
3.3 Lifting the boiler with a crane
You can lift and transport the boiler with a crane ( Fig. 10, [1]).
Insert the hooks on the transport chain [3] into the holes of the four
gusset plates [4] on the boiler body.
Attach the lifting hook of the crane [2] to the lifting rope.
Fig. 10 Lifting the boiler with a crane
[1] Boiler
[2] Crane hooks with safety mechanisms
[3] Hook of lifting rope
[4] Gusset plates (Installation location depends on the boiler size)
4 Mounting
4.1 Installing the boiler
Installation room requirements:
The support surface must provide sufficient load-bearing capacity
and solidity.
The installation room must be dry and free from the risk of frost.
The size of the installation room must be adequate to ensure correct
operation.
Minimum wall clearances
Observe the specified minimum wall clearances for the foundations or
installation surface ( Fig. 11, and Tab. 13). The surface on which the
boiler is to be positioned must be of load-bearing capacity, even and
level. The front edge of the boiler should be flush with the edge of the
foundation.
Fig. 11 shows an installation example.
The burner door closure can be fitted to the left or right ( Chapter 4.5
from page 18).
Boiler dimension data can be found in Chapter 2.16, page 8.
DANGER: Risk to life through falling load.
Only use lifting ropes of the same length.
Only use lifting ropes that are in perfect condition.
Hook lifting tackle only into the lifting eyes provided
in the gusset plates on top of the boiler.
Never hook lifting tackle into the locking lugs on
the side of the boiler, or into the connectors.
Lift the boiler with a crane only if you are suitably
qualified to operate the crane.
Never lift the boiler with a crane on its side or on end.
Never use the locking lugs for lifting.
3
1
4
4
6 720 806 032-23.1ITL
< 90°
_
2
Regarding installation and operation of your heating
system, observe all relevant national standards and
guidelines.
The information on the data plate is binding and must be
observed.
DANGER: Risk to life through poisoning!
Insufficient ventilation can lead to dangerous flue gas
leaks!
Never close off or reduce the size of ventilation and
extract air vents.
Never operate the boiler unless faults are rectified
immediately.
Inform the operator in writing of any faults and their
associated risks.
DANGER: Risk of fire through flammable materials or
liquids.
Never store flammable materials or liquids in the
immediate vicinity of the heat source.
NOTICE: Risk of system damage through frost.
Position the boiler in a room free from the risk of frost.
Boiler Boiler size
Clearance
A
H
in mm
Clearance
A
V
in mm
1)
1) Observe dimension L
BR
(burner length) and dimension B
T
(swivelling range of
the burner door, Tab. 7, page 8 and Tab. 10, page 11) in relation to clearances
A
V
and A
S
(on the closure side of the burner door).
Clearance
A
S
in mm
1)
Uni 3000 F 420 -1850 1000 2500 250+L
BR
2)
2) On the Uni 3000 F, observe the dimension of the particular control unit with
regard to the minimum clearance A
S
(on the installation side of the control unit
250+L
BR
). On the side where the burner door is not hinged, only observe
250mm clearance. If the hinge arrangement may change following installation
please observe the L
BR
dimension.
Table 13 Specified wall clearances
14

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Bosch Uni 3000 F wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Bosch Uni 3000 F

Bosch Uni 3000 F Bedienungsanleitung - Englisch - 12 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info