EN
19
11
/ INSTALLING YOUR APPLIANCE
Separate the two phase wires (L1 and L2)
before hooking up.
NNeeuuttrraall
EEaarrtthh
PPhhaassee
NN
LL
Green/yellow
Blue
Black-grey
Brown
NNeeuuttrraall
EEaarrtthh
PPhhaassee
NN
LL11
LL22
Blue
Green/yellow
Black-grey
Brown
•
220-240 V monophase hook-up
~
-
Warning
If the power cable is damaged, it
should be replaced by the manufacturer, its
after-sales service department or by a per-
son with similar qualifications to avoid dan-
ger.
For a 400 V 2N triphase hook-up, if your hob
malfunctions, check that the neutral conduc-
tor is properly connected.
These hobs must be connected to the power
grid via an electrical outlet that complies with
EIC publication 60083 or an all-pole cut-off
device that complies with installation regula-
tions in effect.
When power is first supplied to your hob, or
after an extended power outage, an indicator
light will appear on the control panel. It auto-
matically disappears after approximately 30
seconds, or as soon as any touch control on
the control panel is pressed. This display is
normal and, if needed, serves as an indication
to the after-sales service staff. In all cases,
the user of the hob should disregard it.
HOOK-UP
••
NNeeuuttrraall
EEaarrtthh
PPhhaassee
NN
LL
Green/yellow
Blue
Brown
•
hook-up 400V 2N
~
-
16A
32A
16A
Separate the wires before hooking up.
NNeeuuttrraall
EEaarrtthh
PPhhaassee
NN11
LL11
LL22
Blue
Green/yellow
Black-grey
Brown
•
hook-up 2x230V 2L+2N
~
-
16A
NN22
•
hook-up 400V 3
~
-
16A