555374
10
Zoom out
Zoom in
Vorherige Seite
1/60
Nächste Seite
2
Product description
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice.
10
2.8.2 Conditions for the boiler room and the environment
2.8.3 Combustion air supply conditions
If the burner is to be operated with sealed combustion by drawing its combustion air solely from the outdoors, follow
burner manufacturer's specification.
2.8.4 Conditions, Fuel
Operating conditions Notes – Requirement in greater detail
Temperature in the boiler room +40 to +104 °F
relative humidity max. 90 % No condensation or precipitation inside the boiler room
Dust/airborne particles Excessive dust inside the boiler room must be avoided when the boiler is operat-
ing, e. g.:
Dust from building work
Combustion air supplied from outside must not be excessively loaded with dust
or airborne particles; if necessary, air filters should be fitted in case:
Air supply contaminated with dust from dirt roads and paths.
Air supply contaminated with dust from production and processing facilities, e. g. quar-
ries, mines, etc.
Airborne particles from thistles and similar
Halogenated-hydrocarbon com-
pounds
The combustion air must be free from halogenated-hydrocarbon compounds.
Identify the source of halogen-hydrocarbon compounds and seal it off. Where this is
impossible, route combustion air from areas that are not contaminated by halogen-
hydrocarbon compounds.
Fans that extract air from the
boiler room.
During burner operation, no mechanical air handling equipment may be operated that could
extract combustion air from the boiler room, e.g.:
–Exhaust hood
Tumble dryer
Ventilation equipment
Small animals Prevent small animals from entering the boiler room, particularly through the air inlet vents –
by fitting them with screens.
Fire safety Maintain clearances between the boiler and flammable materials in accordance with local
regulations. A minimum clearance of 16" is required. Never store flammable materials or
liquids in the vicinity of the boiler.
Flooding In case of an acute risk of flooding, disconnect the boiler in time from its fuel and power
supply before water enters the room. Any components or control equipment, which came
in contact with flood water, must be replaced before re-commissioning.
Tab. 5 Boiler room and ambient conditions
Operating conditions
Boiler output (in case of
multi-boiler systems = total output)
Ventilation air cross-section in square inches
(unrestricted aperture)
Air intake flow cross-section for
combustion air drawn from out-
side (divided between max. 2
apertures)
< 170,000 Btu/hr At least 23.25 square inches
Tab. 6 Observe national regulations for boilers which draw their air supply from the boiler room.
Operating conditions Notes – Requirement in greater detail
Permissible fuels for boilers with-
out integral burners
This boiler can be operated with #2 Fuel Oil ASTM D396-05 Type 2. Select a burner that
is suitable for this fuel typ.
Contamination Free of contaminants (for example dust, mist, humidity), i. e. a constant operation will not
lead to accumulation of deposits, in valves, strainers and filters and could lead to service
calls.
Tab. 7 Fuels
10

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Buderus Logano G115 WS wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Buderus Logano G115 WS

Buderus Logano G115 WS Bedienungsanleitung - Englisch - 8 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info