System start-up
Logano G515 - Subject to technical modifications
8
3 System start-up
This chapter explains how you prepare the system for
operation and how to commission the control panel and
the burner.
3.1 Making the system operational
You should check the following to prepare the system for
operation:
B Operating water pressure of the system
(Æ Chapter 3.2)
B Fuel is supplied and the main fuel shut-off valve is open
B Heating system emergency shutoff switch set to ON
Ask your heating contractor to show you where the fill
valve for your heating system (boiler return) is located.
3.2 Check and correct the operating
pressure
Your heating system must contain sufficient water to
ensure the functionality of your system.
If the operating pressure in the system is too low, fill make-
up water into your system (Æ Chapter 2.3, page 6).
Recently added fill or make-up water loses much of its
volume in the first few days because it releases gases.
With newly filled heating systems, initially check the
operating pressure daily and then in ever increasing
intervals.
Once the system is losing minimal volume, check the
operating pressure of the heating water once a month.
All factory default settings will have already been made by
the heating contractor when the system was first
commissioned.
3.2.1 Checking the operating water pressure
The operating pressure must be at least 15 psi (1 bar).
B Read the current operating pressure and temperature
( °C ( °F)) on the temperature/pressure gauge.
B If the operating pressure drops below 15 psi (1 bar), fill
up the heating water.
Fig. 3 Pressure/temperature gauge
3.2.2 Filling with heating water and bleeding the
system
B Slowly fill the heating system via the on-site fill valve.
During filling, observe the display (pressure gauge).
B Once the desired operating pressure is reached, stop
the procedure.
B Bleed the heating system via the purge valves.
B Add fill water again if the operating pressure drops as
a result of bleeding the system.
NOTICE: Risk of system damage due to
frequent refilling.
B If you need to add water frequently, the
heating system may be damaged by
corrosion and scale buildup depending on
the water quality.
B Bleed the heating system. If necessary, fill
with make-up water.
B Check the heating system for leaks and
the correct operation of the expansion
vessel.
B Notify your heating contractor if you find
the need to refill your heating system
frequently.
Air pockets may form in the heating system
from the fill or make-up water releasing
gases.
Let your local heating contractor show you
where the boiler fill and drain valve for filling
and draining the heating water is located on
your heating system.
7 747 019 141-17.1RS
8

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln
1

Forum

buderus-logano-g515

Suche zurücksetzen

  • I HAVE A FOUL NUMBER F 25 H. CAN YOU TELL ME WHAT THAT MEANS?
    MVH ARNE VEGUSDAL Eingereicht am 9-7-2019 09:30

    Antworten Frage melden

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Buderus Logano G515 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Buderus Logano G515

Buderus Logano G515 Installationsanweisung - Englisch - 68 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info