6 Fitting
Logano plus GB402 – 6 720 804 428 (2012/09)
18
Fig. 17 Fitting the return (RK)
Connection the diaphragm expansion vessel (DEV)
To safeguard individual boilers, a DEV can be connected to the ¾ inch
connection on the return, in accordance with EN 12828.
Install the DEV on site to maintain the system pressure in the return,
upstream of the pump.
Connecting the drain & fill valve on site
To enable a topping up of the heating water, instruct the user about
the location of the drain & fill valve.
Install a drain & fill valve in the return outside the boiler itself.
6.5.4 Installing a DHW cylinder
Make the connection of a DHW cylinder to the flow and return on site.
The MC10 + BC10 control unit can switch the required external cylinder
primary pump ( MC10/BC10 instructions).
6.6 Filling the heating system and checking for leaks
Before commissioning, check the heating system for leaks to prevent
problems during operation.
To ensure good ventilation, open all heating circuits and thermostatic
valves prior to filling the system.
Prior to filling the heating system, carefully read the enclosed
operator's log on water quality.
Open safety caps on all automatic air vent valves.
Open the fill & drain valve.
Slowly fill the heating system using a filling facility. During the filling
observe the pressure gauge.
Fig. 18 Pressure gauge for sealed unvented systems
[1] Red needle
[2] Pressure gauge needle
[3] Green marking
Ensure the heating system is only filled via a WRAS filling method in
accordance with the water regulations. Most commercial heating
system will be at least fluid category 4. The most common way to meet
these requirements is by using an automatic fill unit incorporating an
RPZ.
6.7 Making the electrical connection
The boiler can only function fully with an installed control unit.
When connecting electrical components, also observe the connection
diagram and instructions of the relevant product.
NOTICE: System damage through boiler scaling!
Note the information specified in the operator's log.
NOTICE: Risk of system damage through excess
pressure when testing for leaks!
Pressure, control and safety equipment may be
damaged by excessive pressure.
Pressure test the heating system after filling with the
pressure that corresponds to the safety valve
response pressure.
NOTICE: System damage!
If the heating system is filled when hot, the resulting
temperature stresses can cause stress cracks. The
boiler can then leak.
Only fill the heating system when cold (the flow
temperature should not exceed 40 °C).
Only fill the heating system via a WRAS approved
method in accordance with the water regulations.
Pay attention to the water quality as specified in the
operator's log, and record the volume and quality of
fill water used.
CAUTION: Health risk through contaminated drinking
water.
Observe all country-specific regulations and
standards regarding the prevention of drinking water
contamination.
In Europe, observe standard EN 1717.
DANGER: Risk to life from electric shock!
Prior to all electrical installation work, isolate all poles
of the mains power supply and secure against
unintentional reconnection.
6 720 615 876-59.1RS
3
2
1
18

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Buderus Logano plus GB402 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Buderus Logano plus GB402

Buderus Logano plus GB402 Bedienungsanleitung - Deutsch - 2 seiten

Buderus Logano plus GB402 Bedienungsanleitung - Englisch - 20 seiten

Buderus Logano plus GB402 Installationsanweisung - Holländisch - 60 seiten

Buderus Logano plus GB402 Bedienungsanleitung - Holländisch - 16 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info