636470
29
Zoom out
Zoom in
Vorherige Seite
1/52
Nächste Seite
Commissioning | 29
6 720 805 218 (2016/02)SB625WS/SB745WS
Fig. 29 Securing a cable with a cable clip
Secure all cables with cable clips (part of the control unit standard
delivery) or sleeve in a conduit (if required by code). Perform the
following steps to secure the cables:
Insert the cable clip together with the cable from the top into the slot
in the frame.
Slide the cable clip downwards.
Counterhold.
Flip the lever up.
Fit the back panel.
Refit the cover to the control unit.
Fix the control unit cover with the screws supplied.
6.5 Fitting temperature sensors
The boiler test point is at the top of the boiler body ( Fig. 27 , [1],
page 28).
Measure the depth of the sensor well.
Mark the depth on the temperature sensor set
(lead).
Insert the temperature sensor set as far as it will go into the test
point (to the bottom).
Use the mark to check whether the temperature sensors are
correctly fitted.
Secure the temperature sensor set in the test point with a sensor
retainer.
The plastic coil [2] for keeping the temperature sensors together is
pushed back automatically when it is inserted.
Fig. 30 Inserting the plastic coil into the sensor well
[1] Compensating spring
[2] Plastic spiral
[3] Sensor retainer
[4] Sensor well
Never kink excess lengths of capillaries.
Route the sensor lead through the cable conduit to the control unit.
Connect the sensor lead to the control unit
Complete the commissioning report ( chapter 6.11, page 31).
6.6 Flushing the heating system
To prevent contamination in the boiler, flush the heating system prior to
commissioning.
Flush the system prior to connection to the boiler.
-or-
Isolate the heating flow and return at the boiler.
Connect the heating flow to a water connection.
Connect hose to the heating return of the heating system.
Route hose from the heating return to a drain.
Open connected consumers (e.g. radiators).
Flush the heating system with fresh water until clear water emerges
from the heating return.
Drain the heating system.
NOTICE: System damage through damaged capillaries
or incorrectly fitted temperature sensor.
Ensure that the capillaries are neither kinked nor
squashed when uncoiling and routing them.
Always push the temperature sensor right to the
bottom of the sensor well.
NOTICE: System damage due to incorrect sensor
position!
The safety cut-out (STB) and thermostat (TR) sensors of
the Logamatic 4321 control unit must be fitted at the
installation site ( picture 27, [1], page 28) on the top
of the boiler.
In the case of third party control units, safety cut-out
and thermostat sensors of third party control units
must be fitted in the instrument bulb/probe socket of
the heating supply ( Fig. 1,[6], page 5) of the
boiler.
Do not change the length of the immersion sleeve.
Standard immersion sleeve used: 3/4"
6 720 615 362-20.1SL
Insert compensating spring [1] between the
temperature sensors to ensure a good contact between
sensor well [4] and sensor surfaces, and thereby a
reliable temperature transfer.
If the heating system contains several heating circuits,
these must be flushed one after the other.
6720615883-32.1RS
1
2
3
4
29

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Buderus SB625WS wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Buderus SB625WS

Buderus SB625WS Bedienungsanleitung - Englisch - 12 seiten

Buderus SB625WS Installationsanweisung - Französisch - 56 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info