636468
45
Zoom out
Zoom in
Vorherige Seite
1/68
Nächste Seite
SSB 6720818454 (2016/02) US
Maintenance | 45
7 Maintenance
7.1 General
NOTICE: The installer must inform the user about the
contents of this section. The user must make the necessary
arrangements with qualied service agency for the care and
periodic maintenance of the boiler.
CAUTION: Lack of care and maintenance of this boiler and
equipment may cause an unsafe condition.
A qualied and adequately trained technician must perform
the inspection as specied in these instructions and in the
Service Manual (provided separately) before each heating
season and at regular intervals.
WARNING: Servicing, inspection and adjustment must
be done by a trained technician in accordance with all
applicable local and national codes. Improper servicing or
adjustment could damage the boiler and result in equipment
damage or a dangerous condition!
7.2 Maintenance / inspection schedule for end user
Time interval Maintenance
Annually
Verify the cleanliness of the area around the
boiler
Annually Check the pressure of the hydraulic system
Annually
Check vent piping and verify if leaks are
present
Annually Check air piping and verify if leaks are present
Annually Check relief valve
Monthly (follow local,
state, federal or local
authority having
jurisdiction guidelines)
Verify the condensate discharge system
Every two months Test low water cut off
Every two months Verify the reset button of low water cut off
Every six months Check all piping (gas and water) for leaks
End of heating season Shut off the boiler
Tab. 22 User maintenance / inspection schedule
7.3 Maintenance / inspection schedule for licensed
contractor / gas tter
Time interval Maintenance
Annually * Combustion test
Annually *
Verify condition of ue and air system
(including Venturi and fan)
Annually * Check ignition electrode
Annually *
Cleaning the combustion chamber (including
the burner tube)
Annually * Clean condensate discharge
Annually *
Safety block check, modulation range check,
gas valve closing after burner stop
Annually * Check control parameters
Annually * Check for gas piping leak
Annually * Check wiring and connection
(*) Annually or every 2000 hours. Which occurs rst.
Tab. 23 Licensed contractor / gas tter maintenance / inspection schedule
Time interval Maintenance
Annually * Verify startup
Annually * Verify the ame
Annually * Check relief valve
Annually * Inspect the burner gasket
(*) Annually or every 2000 hours. Which occurs rst.
Tab. 23 Licensed contractor / gas tter maintenance / inspection schedule
7.3.1 Gas leaking inspection
Verify all gas piping to ensure that there are no leaks.
DANGER: To verify the gas leaks use a soap solution or
a gas leak detector. Do not use methods that can cause
explosions!
7.3.2 Check exhaust and combustion air pipe system
Clear vent systems of any obstructions, corrosion, physical damage,
water stains, rust. Verify the connection between the single components.
Verify the outside terminations are clear. Clean the screens and the
louvers if there is any debris.
7.3.3 Inspection of ignition electrode
Verify that the electrode is clean of deposits and use a dollar bill or other
material to remove deposits as required.
Fig. 72 Inspection of ignition electrode
No. Description
1 Burner tube
2 Ignition electrode
7.3.4 Checking for wiring and connections
Check that all wiring is securely fastened and in good condition without
any cracking or alteration of isolation or presence of corrosion in metallic
connection.
7.3.5 Burner gasket inspection
You must maintain the boiler as outlined in this manual and have the
boiler started up and serviced at least annually by a qualied service
technician to ensure boiler/system reliability. This includes a combustion
test and the cleaning of the combustion chamber.
When disassembling the heat exchanger it is crucial to inspect the Burner
Gasket (green: part number 7738004985) for damage.
It is a must to replace the burner gasket when servicing and required if
there is any signs of wear, deformity or discoloration of the gasket and in
any case not later than every two years.
8-10 mm
3-5 mm
1
2
45

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Buderus SSB399 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Buderus SSB399

Buderus SSB399 Installationsanweisung - Französisch - 68 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info