18. Check gas leakage control and minimum gas
pressure switch (if installed); Parameter
must be set to a value greater than or equal to
8, depending on the connected options (see
section 13.2.13). Then set the gas leakage
control pressure switch to a switch pressure
equal to 50% of the inlet pressure. Check that
the measured inlet pressure is not the (higher)
closing pressure.
19. Return the boiler to ‘user level’ by pressing the
reset key.
20. Heat the system to approximately 176
o
F [80
°
C]
and switch off the boiler.
21. Bleed the system and check the water
pressure.
22. The boiler is now ready for operation.
23. Set the boiler controls to the required values.
24. Check all safety controls and ignition systems
for correct operation and safety shutdown
function.
25. Send completed commissioning reports to
DDR Americas Inc.
Note:
The Gas 310/610 ECO is supplied with a number of factory default settings that should be correct for most
installations. If there setting values are required: see sections 13.1 and 13.2.
The following operating situations are now possible:
26.
a. Modulating operation: The output of the boiler modulates on the basis of the flow temperature,
asked by the modulating control (see ‘Note’ in point 25c and section 8.6.2).
b. High/low operation: The boiler is operating at part load or full load, depending on the heat demand
(see section 8.6.5). on the safety boundaries the boiler is going to modulate.
c. On/off operation: the boiler modulates between minimal and maximum output on the basis of the
flow temperature pre-set on the boiler (see section 8.6.4).
d. Important!! The boiler will initially operate in forces part load. The factory setting for forced
part load time is 30 seconds. This setting is correct if modulating controllers are used (see point
25a). A forced part load time of 3 minutes is recommended for on/off operation (setting mode,
parameter
, see section 13.2.3).
e. 0-10 V operation: Depending on the adjustments, two situations are possible (see section 8.6.3):
The given off output varies linear with the sent signal, 2V = 20%, 10V = 100%
The given off flow temperature varies linear with the sent signal (depending on parameter
and
); example: 0V 32°F [0°C], 10V = 212°F [100°C].
The boiler modulates on the basis of the set flow temperature (setting range 68-194°F [20-90°C]
and a maximum
T protection.
Boiler gas ignition control operation and safety shutdown safety check procedure:
1. Shut off electrical power to boiler
2. Shut off main gas supply cocks valve to boiler
3. Restore power to boiler
4. Activate heat demand
5. Observe ignition
6. Observe safety shutdown condition, the boiler
shall shutdown then attempt to restart (max 5
automatic restarts, followed by lock-out code =
 and error on control, confirm shutdown
code is correct.
7. Reset the boiler control
8. Open main gas supply cocks valve
9. Observe ignition and note irregular ignition
consult maintenance section of this manual
45

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für De Dietrich Gas 310 ECO wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info