798460
15
Zoom out
Zoom in
Vorherige Seite
1/40
Nächste Seite
www.dimplex.de E-5
English
8.3
7.3 Heat Source Connection
The following procedure must be observed when connecting the
heat source:
Connect the brine pipe to the heat pump flow and return.
The hydraulic plumbing diagram must be adhered to.
ATTENTION!
The supplied dirt trap must be inserted in the heat source inlet of the heat
pump to protect the evaporator against the ingress of impurities.
In addition, a micro bubble air separator must be installed in the
heat source system.
The brine liquid must be produced prior to charging the system.
The liquid must have an antifreeze concentration of at least 25 %
to ensure frost protection down to -14 °C.
Only monoethylene glycol or propylene glycol-based antifreeze
may be used.
The heat source system must be de-aerated and checked for
leaks.
ATTENTION!
The brine solution must contain at least a 25 % concentration of a
monoethylene glycol or propylene glycol-based antifreeze, which must
be mixed before filling.
7.4 Electrical Connection
The following electrical connections must be established on the
heat pump:
Connection of the control line to the control panel of the heat
pump via terminal X1: L/N/PE.
Connection of the mains cable to the control panel of the
heat pump via terminal X6: L1/L2/L3/PE.
Connection of the brine circulating pump (to be provided by
the customer) to the control panel of the heat pump via ter-
minal X1: PE and pump contactor K5: 2/4/6.
All electrical components required for the operation of the heat
pump are located on the control panel.
For detailed instructions on how to connect the heat pump con-
troller and how it functions (e.g. external wall sensor included in
the scope of supply), please refer to the operating manual sup-
plied with the controller.
An all-pole disconnecting device with a contact gap of at least
3 mm (e.g. utility blocking contactor or power contactor) as well
as a 3-pole circuit breaker with common tripping for all external
conductors have to be provided by the customer. The required
conductor cross-section is to be selected according to the power
consumption of the heat pump, the technical connection require-
ments of the respective utility company as well as all applicable
regulations. Details on the power consumption of the heat pump
are listed on both the product information sheet and the type
plate. The connection terminals are designed for a max. conduc-
tor cross-section of 10 mm².
ATTENTION!
Observe the clockwise rotating field when connecting the mains cable (if
rotating field is not clockwise, the heat pump will not work properly and
will be very noisy).
8 Start-UP
8.1 General Information
To ensure that start-up is performed correctly, it should only be
carried out by an after-sales service technician authorised by the
manufacturer. This may be a condition for extending the guaran-
tee (see Warranty Service).
8.2 Preparation
The following items need to be checked prior to start-up:
The heat pump must be fully connected, as described in
Chapter 7.
The heat source system and the heating circuit must have
been filled and checked.
The dirt trap must have been inserted in the brine inlet of the
heat pump.
All valves that could impair proper flow in the brine and heat-
ing circuits must be open.
The heat pump controller must be adapted to the heating
system in accordance with the controller's operating instruc-
tions.
8.3 Start-Up Procedure
The heat pump is started up via the heat pump controller.
ATTENTION!
The heat pump must be started up in accordance with the installation and
operating instructions of the heat pump controller.
If an overflow valve is fitted to maintain the minimum heating
water flow rate, the valve must be adapted to the requirements of
the heating system. Incorrect adjustment can lead to faulty oper-
ation and increased energy consumption. We recommend carry-
ing out the following procedure to correctly adjust the overflow
valve:
Close all of the heating circuits that may also be closed during
operation so that the most unfavourable operating state - with re-
spect to the water flow rate - is achieved. This normally means
the heating circuits of the rooms on the south and west sides of
the building. At least one heating circuit must remain open (e.g.
bathroom).
The overflow valve should be opened far enough to produce the
maximum temperature spread between the heating flow and re-
turn flow listed in the table below for the current heat source tem-
perature. The temperature spread should be measured as close
as possible to the heat pump. The heating element of mono en-
ergy systems should be disconnected.
Any faults occurring during operation are displayed on the heat
pump controller and can be corrected as described in the heat
pump controller's operating instructions.
Heat source
temperature Max. temperature spread
between heating flow and return
flow
From To
-5° C 0° C 10 K
1° C 5° C 11 K
6° C 9° C 12 K
10° C 14° C 13 K
15° C 20° C 14 K
21° C 25° C 15 K
15

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Dimplex SI 5BS wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info