6Installation
6.1 General Information
The brine-to-water heat pump must be installed in a frost-free,
dry room on an even, smooth and horizontal surface. The entire
frame should lie directly on the floor to ensure an adequate
soundproof seal. Failing this, additional sound insulation meas-
ures may become necessary.
The heat pump should be installed to allow easy maintenance/
service access. This is ensured if a clearance of approx. 1 m in
front of the heat pump is maintained.
Neither frost nor temperatures higher than 35 °C must occur in
the installation location at any time of the year.
6.2 Sound Emissions
The heat pump offers silent operation due to efficient sound in-
sulation. Any vibration transmission to the foundation or the
heating system can be largely prevented by internal sound de-
coupling measures.
7Mounting
7.1 General Information
The following connections need to be estab-lished on the heat
pump:
Flow and return of the brine (heat source system)
supply/return flow of the heating system
Temperature sensor
Voltage supply
7.2 Connection on Heating Side
ATTENTION!
!
!
The heating system must be flushed prior to connecting the
heat pump.
Before completing the heat pump connections on the heating
water side, the heating installation must be flushed in order to
remove any impurities that may be present, as well as residues
of sealing material, and the like. Any accumulation of deposits
in the condenser may result in a total failure of the heat pump.
Once the installation on the heating side has been completed,
the heating system must be filled, de-aerated and pressure-
tested.
Consideration must be given to the following when filling the
system:
Untreated filling water and make-up water must be of
drinking water quality (colourless, clear, free from sedi-
ments)
Filling water and make-up water must be pre-filtered (pore
size max. 5 µm).
Scale formation in domestic hot water heating systems cannot
be avoided, but in systems with flow temperatures below 60 °C,
the problem can be disregarded. With high-temperature heat
pumps and in particular with bivalent systems in the higher per-
formance range (heat pump + boiler combination), flow tem-
peratures of 60 °C and more can be achieved. The following
standard values should therefore be adhered to with regard to
the filling and make-up water according to VDI 2035, sheet 1:
The total hardness values can be found in the table.
Fig. 7.1:Guideline values for filling and make-up water in accordance with
VDI 2035
For systems with an above-average specific system volume of
50 l/kW, VDI 2035 recommends using fully demineralized
water and a pH stabiliser to minimize the risk of corrosion in the
heat pump and the heating system.
ATTENTION!
!
!
With fully demineralized water, it is important to ensure that
the minimum permissible pH value of 7.5 (minimum
permissible value for copper) is complied with. Failure to
comply with this value can result in the heat pump being
destroyed.
1m
0,5m
Total heat
output in kW
Total alkaline earths
in mol/m³ and/or
mmol/l
Specific system volume
(VDI 2035) in l/kW
< 20 20 < 50 50
Total hardness in °dH
< 50 2.0 16.8 11.2
< 0.111
50 - 200 2.0 11.2 8.4
200 - 600 1.5 8.4 < 0.111
> 600 < 0.02 < 0.111
1. This value lies outside the permissible value for heat exchangers in heat
pumps.
22

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Dimplex SIH 20TE wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Dimplex SIH 20TE

Dimplex SIH 20TE Bedienungsanleitung und Installationsanweisung - Holländisch - 24 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info