Inner transit packaging removal
Before installation
8 Remove the four screws securing the bracket to the machine
casing and lift out the transit bracket.
• Refit the lid and two screws.
To replace the packaging (eg: for moving house), reverse the
procedure described above.
Please retain the transit packaging for future use, as it
should be used whenever the machine is relocated.
Moving the Contrarotator
TM
• To move the machine, pull out the Rollerjack
TM
handle from
underneath the machine, which will enable you to manoeuvre
the machine easily into your desired position.
• Replace the Rollerjack
TM
slowly because the handle may return
with force.
NB: The Rollerjack
TM
is designed for final positioning only and
not suitable over long distances. Do not push with your foot.
4 01
Before installation, check the machine for damage.
A qualified person should always carry out installation.
All packaging must be removed before the machine is
connected to power or water supplies.
1 Open the outer door and carefully lift out the foam inserts
from the front of the inner door.
2 Take off the rear panel by removing the seven screws, using
a cross-head screwdriver.
3 Carefully withdraw the foam block and then refit the rear
panel and screws.
4 Remove the two screws from the rear of the lid.
5 Remove the lid by sliding it backwards and upwards.
6 Remove the plug inserted into the transit bracket from inside
the machine.
7 Using the Dyson spanner remove the four bolts securing the
top transit bracket.