ENGLISH
19
COVERINGASSEMBLY
Covering parts list:
• side tiles (4 pcs)
• side aluminium panels (4 pcs)
• cast iron top
• pellet hopper cover
• top tiles (2 pcs)
• front ceramic tile (75)
If the side ceramic tiles vibrate during operation, you can apply the gasket supplied by following
these instructions:
• Loosen the fastening screws found under the tiles of the cast iron top and the 2 screws of the
rear panel
• Move the cast iron top sideways, leaving enough space for the ceramic tiles to pass
• Carefully remove the ceramic tiles from the sides, ensuring not to damage them
• Cut 4 pieces of about 3 cm from the 8 x 1 black adhesive gasket (cod. 188140), supplied with the
documentation,and apply them to the back of the ceramic tiles in the positions shown in the figure,
indicated by an *.
• Insert the ceramic tiles in place
• Put the cast iron top back into its central position and fasten the screws previously removed
After positioning the frame according to the instruc-
tions shown in the INSTALLATION INSTRUC-
TIONS chapter, proceed as follows in the order
shown:
• remove the 8 screws found under the top tiles (14)
and the 2 rear panel screws (49);
• lift the top up 2/3 cm (15) and move it slightly to
the right, enough to insert the two side tiles (11) into
the aluminium bars (12-13);
• move the top (15) to the left, enough to insert the
two side tiles (11) into the aluminium bars (10-13);
• put the top (15) back in the middle and replace the
previously removed screws;
• put the two upper tiles (14) in place.
Lastly, open the door, unscrew the round-head
self-tapping screws which fix the cast iron rear
support (73) to the structure, and remove it.
Now fasten the front ceramic insert with silicone (75)
to the previously removed support.
Repeat the steps in reverse order to put the support
(73) back on the structure.