ENGLISH
Installation
5
Unpacking
All transit bolts and packing must be removed
before using the appliance.
You are advised to keep all transit devices so that
they can be refitted if the machine ever has to be
transported again.
1. Using a spanner, unscrew and remove the rear
right-hand bolt and lay the machine on its back,
taking care not to squash the hoses. This can be
avoided by placing one of the corner packing
pieces between the machine and the floor.
2. Remove the polystyrene base and take off the
bottom panel by unscrewing the central screw.
3. Carefully remove the right-hand bag.
4. Carefully slide out the other bags.
5. Re-fit the bottom panel using the 4 screws
supplied with the door hinges (in the plastic bag)
and the previously removed screw.
6. Set the machine upright and remove the two
remaining bolts from the back.
7. Pull out the three plastic spacers from the holes
into which the bolts were fitted.
8. Plug all the holes with the plugs which you will
find in the plastic envelope containing the
instruction booklet.
Positioning
Install the machine on a flat hard floor.
Make sure that air circulation around the machine is
not impeded by carpets, rugs etc. Check that the
machine does not touch the wall or other kitchen
units.
Carefully level by screwing the adjustable feet in or
out. Never place cardboard, wood or similar
materials under the machine to compensate for any
unevenness in the floor.