5 Installation and connection of the charging station
5.1 Installation of the station on the foundation
After the foundation with the built-in anchoring structure and installation pipe is constructed,
the charging station can be installed on the foundation. The foundation must be left to dry for
at least two days before the cable routing and installation works can begin.
The casing of the station is fixed to the bolts on the underground anchoring structure after the
screws on these same bolts have been temporarily removed. After the charging station is
placed on the foundation, all of the bolts must extend through the bottom plate of the casing. A
ring spanner is used to fix the station to the foundation using the previously removed screws.
Some of the bolts may require the use of a ring spanner with an offset handle. Care must be
taken not to damage the thread of the bolts on the foundation while fixing the charging station.
After the installation of the casing on the bolts, one of the bolts is used to attach the grounding
cable shoe.
5.1 Cabling route for the connection of multiple charging stations
The charging station can be installed independently or combined in connection with other
stations (the so called clustering of charging stations).
Figure 16: Cabling route for multiple charging stations