696315
6
Zoom out
Zoom in
Vorherige Seite
1/36
Nächste Seite
6 ENGLISH
INTROdUCTION
The boilers produced in our factory are built with attention to the individual components so as to protect both the user and the
installer from any accidents. It is therefore recommended that after any intervention on the product, the authorised sta pay particular
attention to the electric connections, especially the stripped parts of the wires. These must not escape from the terminal board in any
situation, thus preventing possible contact with the live parts of the wire.
The instruction manual is an integral part of the product: make sure that it always accompanies the appliance, even if transferred to
other owners or user or is transferred to another place. If it is damaged or lost, request another copy from the area technician.
This generator must be intended for the use it has been specically made for. The manufacturer is exemptded from any liability,
contractual and extracontractual, for injury/damage caused to persons/animals and objects, due to installation, adjustment and
maintenance errors and improper use.
INSTALLATION
Installation of the generator and auxiliary equipment in relation to the heating system must comply with all current Standards and
Regulations and to those envisioned by the law. Installation must be carried out by authorised sta, who must provide the buyer with
a declaration of conformity for the system and will assume full responsibility for nal installation and as a consequence the correct
functioning of the installed product.
It is necessary to bear in mind all laws and national, regional, provincial and town council Standards present in the country the
appliance has been installed.
The Manufacturer cannot be held responsible for the failure to comply with such precautions. It is recommended to wash all the pipes
of the system well before installation to remove any residue that could compromise the correct operation of the appliance. During
installation, inform the user regarding:
a. If water leaks, he must close the water supply and promptly inform the after-sales technical service.
b. The system working pressure must be checked periodically. If the generator is not used for a long period of time, it is recommended
to contact the after-sales technical service to carry out at least the following operations:
- Set the master switch to position 0.
- Close the water taps of both the heating system and the domestic hot water system.
- Empty the heating system and the domestic hot water system if there is risk of freezing.
COMMISSIONING
After removing the packaging, ensure that the content is intact and complete.
Otherwise, contact the dealer where the appliance was purchased.
When commissioning the product, verify that all safety and control devices the generator consists of work properly. All electrical
components that make up the generator must be replaced with original spare parts exclusively by an authorised technical assistance
centre, thereby guaranteeing correct operation.
Before leaving the system, the sta in charge of commissioning must monitor the operation of the generator for at least one complete
work cycle. The geneerator must be serviced at least once a year, programming it in advance with the technical assistance centre
STANdARdS
The boilers have been designed and realised in compliance with the following Directives:
UNI EN 303-5 Boilers for central heating. Boilers for solid fuel, with manual and automatic feeding, with a nominal heat output
of up to 500 kW
dIRECTIVES
2006/42/EC: directive MD
2014/30/EU: directive EMCD
2014/35/EU: directive LVD
2011/65/EU: directive RoHS 2
fOR SAfETY
It is forbidden for the generator to be used by children or unassisted disabled persons.
Do not touch the generator when you are barefoot or when parts of the body are wet or humid.
The safety and adjustment devices must not be modied without the authorisation or indications of the manufacturer.
Do not pull, disconnect, twist electric cables leaving the gnerator, even if disconnected from the electric power supply mains.
Do not close or reduce the dimensions of the airing vents in the place of installation.
The airing vents are indispensable for correct combustion.
6

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Extraflame HP30 EVO wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Extraflame HP30 EVO

Extraflame HP30 EVO Bedienungsanleitung - Deutsch - 36 seiten

Extraflame HP30 EVO Bedienungsanleitung - Holländisch - 36 seiten

Extraflame HP30 EVO Bedienungsanleitung - Französisch - 36 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info