1. COMMISSIONING
1.1 Having run the gas supply to the stove, PURGE THE SUPPLY
PIPE, this is essential to expel any debris that may block the
gas controls. Connect the gas supply to the 8mm
compression elbow at the RH rear corner of the stove, see
diagram 1.
1.2 Connect a suitable pressure gauge to the test point located
on the inlet fitting, and turn the gas supply on. Light the
appliance and check all gas joints for possible leaks. Turn the
appliance to maximum and check that the supply pressure is
as stated on the data badge. Turn the gas off and replace the
test point screw, turn the gas on and check the test point for
leaks.
1.3 Check that the installation instructions and any local
regulations are complied with. Check that all seals are in
good condition. Complete the Appliance Commissioning
Checklist at the front of these Instructions. Explain the
operation of the appliance to the end user.
Hand the completed instructions to the User for safe
keeping, as the information will be required when making
any guarantee claims.
19
INSTALLATION INSTRUCTIONS
COMMISSIONING
AR0934
1