9
Installation Preparation
Preparation WITH an Accessory Storage Drawer
NOTE: MODEL ZSC1201 CAN ONLY BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER IF INSTALLED ABOVE 36-3/4
″
.
MODEL ZSC1202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT
AN ACCESSORY STORAGE DRAWER FOR THIS MODEL.
Installation over a GE/Monogram
Warming Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location
do not obstruct the required interior depth
and height. See Warming Drawer installation
instructions for details.
30″
23-1/2″
25-1/4″
Min.
21″
2″Min.
(3
″Recommended)
Per Warming
Drawer
Requirement
Construct Solid
Bottom Min. 3/8″
Plywood Supported
by 2 x 4 or 2 x 2
Runners all Four Sides
PREPARE THE OPENING (cont.)
The Advantium 120V can be installed in
combination with other GE/Monogram appliances.
Always follow each product’s Installation
Instructions to complete the installation.
Single Advantium 120V Installation:
Order a 30″wide single oven cabinet or cut
the opening in a wall to the dimensions shown.
• Allow 2-1/8″ case trim overlap on the sides,
1-1/16″overlap on the top and 7/8″overlap
on the bottom of the opening for all models.
• Oven overlaps will conceal cut edges on all sides
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2″between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 120V and the other
appliance overlaps.
Construct a solid oven floor of 3/8″min. thick plywood
supported by 2 x 4 or 2 x 2 runners on all sides.
• The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
30″
23-1/2″
25-1/4″
Min.
21″
Construct Base
Min. 3/8″Plywood
Supported by 2 x 4
or 2 x 2 Runners
all Four Sides
PREPARE THE OPENING (cont.)
36-3/4″
Min.*
*Required for
Monogram models
*Required for
Monogram models
36-3/4″
Min.*