C:After the scheduling is started,press the scheduling key " " to check the remaining time
of the appointment and reset the scheduling time.During the scheduled time,the machine is
shut down or started upunder temperature control,and the scheduled time is always
normal,and free from down time. During the scheduled time,it is cleared incase of power failure,
<Child Lock Function>:In the working and the standby no child lock effective
state, press " " and "MODE" for 3 seconds to turn on the child lock function.Under the
working status and the effective state of the standby open child lock,press
“ ” and “MODE” simultaneously for 3 seconds to turn off the child lock function.
Remarks:
1.when the working state running child lock take seffect,standby operation can be
performed.Other operations are invalid(except releasing the childlock);the child lock is
canceled after standby.
2.When the child lock is ineffect during standby, all operations are invalid (except releasing the
child lock).
<Memory function>:
After the machine is on standby,it will be started up again and will operate according to the
status before the last standby. Power off and power on again. It is running in accordance with
the state before the power failure. After normal standby, and then power off, it will run at factory
defaults, namely high-grade operation, set the temperature to 35℃ by default when powering
on again.
Note:After power failure, the child lock function does not remember.
<Safety protection function>:
When the indoor ambient temperature Th exceeds 50°C under the standby or working state,
all out puts are turned off, the buzzer prompts 10 long beeps, the digital screen displays "FF"
and flash es at 1 Hz for 75 seconds. As long as there is protection, even if the ambient
temperature is less than 50°C, the running or operation can not be resumed, and the operation
can only be performed after the power is turned off and on again.
<Shut down>:
Under the working state, press the standby key “ ” on the control panel to enter the standby
state, unplug the power cord, wait for the whole machine to cool, and place the heater stably.
[Note]
To use the machine for the first time or to re-insert the socket, please pay attention to check
whether the plug and the socket are fitted well.
<Inspection method>
Insert the power plug into the socket and start for use; after about half an hour, turn off and
pull out the plug. Check whether the plug pins are hot; replace the socket if so (more than
about 50 °C) to avoid burning the plug or even causing a fire caused by overheating of the
socket due to poor contact.