Tests for electrical systems include “visual inspection”, “testing”
and “measurement”, and thus may only be conducted by experts
with appropriate work experience.
In the final analysis, the values from VDE 0664 are technically
binding.
21.3 Testing Electrical Machines per DIN EN 60204 –
Applications, Limit Values
The PROFITEST 204+ test instrument has been developed for the
testing of electrical machines and controllers. After a revision to
the standard in 2007, measurement of loop impedance is now
additionally required. Measurement of loop impedance, as well as
other measurements required for the testing of electrical
machines, can be performed with test instruments from the
PROFITEST MASTER series.
Comparison of Tests Specified by the Standards
Uninterrupted Connection of a Protective Conductor
Uninterrupted connection of a protective conductor system is
tested here be using an alternating current of 0.2 to 10 A with a
line frequency of 50 Hz (= low-resistance measurement). Testing
must be conducted between the PE terminal and various points
within the protective conductor system.
Loop Impedance Measurement
Loop impedance Z
L-PE
is measured and short-circuit current I
K
is
ascertained in order to determine if the breaking requirements for
protective devices have been fulfilled (see section 8).
Insulation Resistance Measurement
All of the active conductors in the primary circuit are short-cir-
cuited at the machine (L and N, or L1, L2, L3 and N) and mea-
sured against PE (protective conductor). Controllers or machine
components which are not laid out for these voltages (500 V DC)
can be disconnected from the measuring circuit for the duration
of the measurement. The measured value may not be any less
than 1 MOhm. The test can be subdivided into separate seg-
ments.
Voltage Tests (with PROFITEST 204HP/HV only)
The electrical equipment of the machine under test must with-
stand a test voltage of twice its own rated voltage value or 1000
V~ (whichever is largest) applied between the conductors of all
circuits and the protective conductor system for a period of at
least 1 second. The test voltage must have a frequency of 50 Hz,
and must be generated by a transformer with a minimum power
rating of 500 VA.
Voltage Measurement
The EN 60204 standard specifies that after switching supply
power off, residual voltage must drop to a value of 60 V or less
within 5 seconds at all accessible, active components of a
machine to which a voltage of greater that 60 V is applied during
operation.
Function Test
The machine is operated with nominal voltage and tested for cor-
rect functioning, in particular with regard to safety functions.
Special Tests
Pulse control mode for troubleshooting (with
PROFITEST 204HP/HV only)
Protective conductor test with 10 A test current (with
PROFITEST 204+ only)
Limit Values per DIN EN 60204, Part 1
Overvoltage Protection Device Characteristics for
Limit Value Selection for Protective Conductor Testing
Tests per DIN EN 60204, part 1
(machines)
Tests per DIN EN 61557
(systems)
Meas.
Func-
tion
Uninterrupted connection of a
protective conductor
Part 4: resistance of:
– Ground conductor
– Protective conductor
– Bonding conductor
RLO
Loop impedance Part 3: loop impedance ZL-PE
Insulation resistance Part 2: insulation resistance RISO
Voltage test
(test for absence of voltage)
——
Voltage measurement (protec-
tion against residual voltage)
Part 10: Combined measuring
equipment (amongst others for volt-
age measurement) for testing, mea-
suring or monitoring of protective
measures
U
Function test ——
Measurement Parameter Cross-
Section
Standard
Value
Protective conduc-
tor measurement
Test Duration 10 s
Limit value for protective
conductor resistance
based on phase conductor
cross-section and charac-
teristics of the overvoltage
protection device (calcu-
lated value)
1.5 mm²
2.5 mm²
4.0 mm²
6.0 mm²
10 mm²
16 mm²
25 mm² L
(16 mm² PE)
35 mm² L
(16 mm² PE)
50 mm² L
(25 mm² PE)
70 mm² L
(35 mm² PE)
95 mm² L
(50 mm² PE)
120 mm² L
(70 mm² PE)
500 m
500 m
500 m
400 m
300 m
200 m
200 m
100 m
100 m
100 m
050 m
050 m
Insulation resistance
measurement
Nominal voltage 500 V DC
Resistance limit value 1M
Leakage current
measurement
Leakage current 2.0 mA
Voltage measure-
ment
Discharge time 5 s
Voltage test
Test duration 1 s
Test voltage 1 kV
or 2 U
N
Breaking Time, Characteristics Available for Cross-Section
Fuse breaking time: 5 s All cross-sections
Fuse breaking time: 0.4 s 1.5 through 16 sq. mm
Circuit breaker, characteristic B
Ia = 5 x In – breaking time: 0.1s
1.5 through 16 sq. mm
Circuit breaker, characteristic C
Ia = 10x In – breaking time: 0.1s
1.5 through 16 sq. mm
Adjustable circuit breaker
Ia = 8 x In - break time: 0.1s
All cross-sections
91

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Gossen Metrawatt PROFITEST MTECH plus wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info