Initial Preparation
Warning: To prevent damage to machine, boiler must be filled with water before turning main power switch on.
1.
2.
3.
4.
5.
6.
*Required to validate warranty. (See warranty for details).
Before operating the machine, please read the operation and instruction manual.
Needed for installation:
•
•
•
•
•
Remove machine from carton and position machine in operating location.
At this point, please refer to Installation Instructions on Page 6.
If there is a problem, consult the Troubleshooting Guide in this manual.
If you cannot correct a problem, call Grindmaster Corporation’s Hotline for help at 800-695-4500 or
+1-502-425-4776, Monday through Friday, 8 A.M. until 8 P.M., EST.
Access to cold water line with minimum of 30 P.S.I. pressure, drain, and heavy-duty grounded receptacle with its
own breaker. Models 2450 & 1750 use 115V, 20 AMP receptacle. Q models use 230V (3 wire plus ground), 20
AMP receptacle. E models use 230V, 15 AMP receptacles with proper plug installed by customer.
1
/
4
” copper tubing
(4)
1
/
4
” female flare fittings
In-line water filter system*
3
/
4
” ID flexible drain hose
IMPORTANT
Failure to use in-line water
filter voids warranty!
Page 3 Espressimo 2450 & 1750 Espresso Cappuccino Machines