SETTING UP + INSTALLATION
Remove the polystyrene base and place the machine near
its permanent position (diagram 1).
Carefully cut through the hose retaining clip at the rear of
the appliance (diagram 2).
Unscrew the central bolt (A); unscrew the 4 lateral screws
(B) and remove the cross piece (C).Unscrew the two rods D
and remove them. Two plastic spacers will fall inside the
machine. (diagram 3).
Lean the machine forward, remove the mentioned plastic
spacers and remove the plastic bags containing the two
polystyrene blocks at the sides, pulling downwards.
(diagram 4).
Stop the holes using the plugs that you will find inside the
bag containing the instruction booklet. (diagram 5).
WARNING:
DO NOT LEAVE THE PACKAGING WITHIN REACH
OF CHILDREN AS IT IS A POTENTIAL
SOURCE OF DANGER.
Apply the insulation sheet of corrugated material to the base
as shown.
Level the machine using the 4 feet.
a) Turn the nut clockwise to release the screw adjuster on the foot.
b) Rotate the foot to raise or lower it until it stands firmly on the
ground.
c) Lock the foot in position by turning the nut
anti-clockwise until it comes up against the bottom of the machine.
1
2
3
4
5
27
EC Appliance complies with European Directive 89/336/EEC, 73/23/EEC and
subsequent amendments.
Fig. 2
26
Technical data
■
Max. load of dry laundry for washing
■
Water pressure
Measurements
■
Width
■
Depth
■
Height
NB: For specifications regarding electrical data, see the data panel on the front of the washing
machine (porthole area) - as shown in diagram above.
6 kg
0,05 ÷ 0,8 MPa
60 cm
54 cm
82 cm