3 Installation
3.1 Introduction - Installation
WARNING: Read and understand the
safety chapter before you install the product.
CAUTION: Use original spare parts and
installation material.
Note: Refer to www.husqvarna.com for more
information about installation.
3.2 Primary components for installation
The installation includes the components that follow:
•Robotic lawn mower that cuts the lawn
automatically. It includes a cutting deck and a drive
unit.
• Charging station, that charges the product. It
includes a power supply, which is connected to an
100-240V power outlet.
• Reference station8, that receives satellite signals
and sends correction data to the robotic lawn
mower.
• Mobile device9 with the Husqvarna Fleet
Services™ and the Automower® Connect app to
do the installation and the settings for the product.
3.3 To prepare for installation
CAUTION: Holes with water in the lawn
can cause damage to the product.
CAUTION: Read the installation
chapter before you start the installation.
• Make a blueprint of the work area and include all
obstacles. This makes it easier to examine where
to put the charging station, the reference station,
and the virtual boundaries.
•Make a mark on the blueprint where to put
the charging station, the reference station, the
maintenance point, the transport paths and the
virtual boundaries for the work areas and stay-out
zones.
• Follow the instructions for distances between
obscuring objects.
• Make the ground in the lawn flat. Make sure that
there are no holes or bulges in the lawn.
•Cut the grass before you install the product. Make
sure that the grass is maximum 10 cm / 4 in.
Note: The first weeks after installation the sound level
when the product cuts the grass can be higher than
usual. The sound level decreases after some time.
3.4 To examine where to put the
reference station
Read and understand the instructions about where to
put the reference station. Refer to the Operator's manual
for the reference station.
3.5 To examine where to put the
charging station
•You can put the charging station in the work
area or not in the work area. No transport path
is necessary if the charging station is put in the
work area (A). No transport path is necessary if
the product is fully in the work area when it is at
the charging station docking point. If the charging
station and docking point (B) are not in the work
area, you must install a transport path (C).