STEP 2 (See Diagram 2)
A.) Lift up the Selector Stem (#10) on the Right Station (#1) and
hold it still to release the tension on the cables. Remove the two
M10 x ¾” Allen Bolts (#44), Ø ¾” Spring Washers (#47), and Ø 1”
Washers (#50) which were pre-assembled in the factory to hold the
Guide Rod Bracket (#6).
B.) Pull the two Guide Rods (#7) away from the Upright. Remove
the Guide Rod Bracket (#6) from the top of the Guide Rods.
C.) Remove the Selector Stem (#19) from the Guide Rods.
D.) Slide fifteen 10lb Weight Plates (#13) from the top of Guide
Rods down to the Rubber Bumpers (#37). Make sure the weight
sticker cut out is facing the inside of the machine.
E.) Slide the Selector Stem back onto the Guide Rods. Hold the
Selector Stem above the weight stack to make it easier to re-install
Guide Rods and Bracket.
F.) Re-install the Guide Rod Bracket (#6) onto the Guide Rods.
G.) Push the Guide Rod Bracket back into the upright.
H.) Secure the Bracket back to the upright frame with the two M10
x ¾” Allen Bolts (#44), Ø ¾” Spring Washers (#47), Ø1” Washers
(#50).
I.) Lower the Selector Stem down onto the top of the weight stack.
J.) Check all the cables to make sure they are on track on the
pulleys.
K.) Peel off the weight resistance label from the Resistance Label
Set (#58) and attach to the plates.
L.) Insert the Weight Selector Pin (#12) into the weight stack.
M.) Lubricate the Guide Rods with super lube or lube provided.
N.) If Needed, Adjust the Cable tension by first loosening the M10 x
2” Allen Bolt (#10) then rotate the Tension Adjustment Plate (#60)
clock or counterclockwise to move the Bolt and the Large Pulley
(#61) up and down along the open track inside the U-shaped Pulley
Bracket (#62). Once desired tension is achieved, securely tighten
the Bolt (#10) back.
O.) Repeat the Procedure A through N above to install the other set
of weight plates to the Left Station (#2).
PAGE 7 6/2011