726290
35
Zoom out
Zoom in
Vorherige Seite
1/524
Nächste Seite
- 14
The heating appliance of the machine is an ignition plant.
Please follow the local regulations while installing it.
Use only certified chimneys/exhaust pipes.
DANGER
Scalding danger! This symbol must be attached at every tapping
point.
While installing a fuel tank for the heating oil in the machine in-
stallation room, please follow the regulations applicable to the
storage of inflammable fluids (can be acquired from Carl Hey-
manns Verlag, Cologne, www.heymanns.com).
Please follow the diagram given below for laying the fuel pipes.
It is necessary to provide a two-channel system - for the forward
and backward flow.
Maximum starting pressure of the fuel: 0.05 MPa (0.5 bar)
Maximum under-pressure between fuel filter and pump: 0.04
MPa (0.4 bar)
Suction pipe length in m
Suction height in m
Possible suction pipe length in pipes with NW 8
Each appliance must be connected to a separate chimney.
The exhaust system must be designed according to the local
rules and regulations after consulting the concerned chimney
expert.
We recommend the installation of a draught interceptor between
the plant and the chimney.
Note: The chimney draught specifications given in the technical
data must be maintained if you want to achieve the prescribed
combustion values.
Before installing, please check the load-bearing capacity of
the wall. The fastening material delivered with the plant is
suitable for concrete walls. Use suitable anchor plugs and
screws for hollow component walls, brick walls and gas con-
crete walls - for e.g. injection anchor (for drilling diagram see
the specifications sheet).
Figure 3 - items 19 and 23
The appliance should not be directly attached to the network
of water and high pressure pipes. It is mandatory to install the
connecting hoses.
Figure 3 - A
A shut-off tap must be installed between the main water sup-
ply and the connecting hose.
All national laws and regulations about installation of electrical
appliances must also be followed when installing high pressure
lines.
The pressure loss in the pipe connections must lie below 1.5 MPa.
The completed pipe connections must be checked using 28 MPa.
The insulation of the pipes must be resistant to temperatures
until 155 °C.
Figure 3 - Pos. 20
The tanks are to be installed in such a way that the lower level
mirror of the detergent should not be more than 1.5 m under the
machine floor and the upper level mirror should not be located
above the machine floor.
Figure 3 - B and item 19
The water inlet is to be connected to the main water supply
using an appropriate water hose.
The water supply must have a minimum output of 1300 l/h at
minimum 0.1 MPa.
The water temperature must lie below 30 °C.
ATTENTION
The highest allowed net impedance at the electrical connection
point (refer to technical data) is not to be exceeded. In case of
confusion regarding the power impedance present on your con-
nection, please contact your utilities provider.
Note: Operating procedures create short term power sinkings.
During unfavorable net conditions other devices might be dis-
turbed.
For connection values, see technical data and type plate.
The electrical connections must be done by an electrician ac-
cording to IEC 60364-1.
Current-carrying parts, cables and appliances in the working
area must be installed in a defectless state and must be pro-
tected against water sprays.
DANGER
To avoid accidents due to electrical faults we recommend the use
of sockets with a line-side current-limiting circuit breaker (max.
30 mA nominal tripping current).
Establish the electrical connection.
A main switch that can be locked (figure 3 - item 6) is to be in-
stalled at a safe and easily accessible place to switch off the sta-
tionary high pressure cleaner.
The contact opening of the main switch must be minimum 3 mm.
Install Cekon plug on the connection cable of the appliance.
Insert Cekon plug into the socket.
To switch off the stationary high pressure cleaner, the Cekon plug
must be easily accessible so that it can be removed from the
mains.
Before using for the first time, cut off the tip of the lid of the oil
tank on the water pump.
Installing the plant
Only for authorised technicians!
General
Replace high pressure
nozzle with steam
nozzle if working tem-
perature is above 100
°C.
Fuel tank for heater
Fuel pipes
Smoke pipe
Wall mount
!
4.116-001.0
4.116-000.0
Installing the high pressure connections
Install the detergent tank
Water supply
Electrical connection
Firmly installed electrical connection
Electrical connection with plug/ socket
Initial startup
35EN
35

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Karcher HDS 12-14-4 ST wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info