Fig. 4
• Using a pencil, draw a line on the wall up to the
ceiling that corresponds with the centre line;
this will make installation easier.
• Establish the most suitable distance from the
work surfaces according to your needs
(Important! Respect the minimum distances
indicated on p6 of this instruction booklet),
draw a horizontal line on the wall corresponding
to this distance and apply the perforation layout:
the vertical centre line printed on the
perforation layout should correspond with the
centre line drawn on the wall; furthermore the
lower edge of the perforation layout should
correspond with the horizontal line drawn.
• Place the lower support bracket on the
perforation layout making it coincide with the
sketched rectangle. Mark the two external holes
then drill the holes. Remove the perforation
layout and insert 2 wall plugs and fix the hood
support bracket with 2 x45mm screws.
Fig. 5
• Hang the hood on the lower bracket.
• Adjust the distance of the hood from the wall.
• Adjust the horizontal position of the hood.
• From the inside of the hood, make 2 pencil
marks for the holes ready for the final fitting of
the hood.
• Remove the hood from the lower bracket.
• Drill in the points indicated.
• Insert 2 wall plugs.
Installation
8