STEP 14:
• Refer to the cable ILLUSTRATION “A” on page 14 for cable routing while installing pulleys.
• Assemble one 3-1/2” PULLEY (24) into the PRIMARY PIVOT (9) lower hole using one
3/8 X 8-3/4” BOLT (31), two 3/8” FLAT WASHERS (36), two 3/8 X 1-3/8” SPACERS (44) and one
3/8” LOCK NUT (34) and tighten securely.
• Assemble one 3-1/2” PULLEY (24) to the FRAME (1) using one 3/8 X 3-3/4” BOLT (30), two
3/8 X 1-1/16” FLANGE SPACERS (42), and one 3/8” LOCK NUT (34). Tighten securely.
• Loosely assemble one 3-1/2” PULLEY (24) between the PULLEY PLATES (12) using one
3/8 X 1-3/4” BOLT (27) and one 3/8” LOCK NUT (34).
• Assemble two 3-1/2” PULLEYS (24) between the left and right BOOM PLATES (4 & 5) using two
3/8 X 3-3/4” BOLTS (30), two 3/8 X 1” SPACERS (43), two 3-1/2” CABLE GUARDS (38) and two
3/8” LOCK NUTS (34).
F
IGURE 14