6
ASSEMBLY STEPS
J
H
26
Overhead obstructions within the “use”
zone shall not be within 84" (2.15 m) of
the highest platform (platform #4). All
overhead utility line clearances shall
comply with all local, state and national
codes such as the National Electric
Safety Code.
1
6' (2 m)
minimum
6' (2 m)
minimum
6' (2 m)
minimum
6' (2 m)
minimum
WARNING:
• Observing the following statements and
warnings reduces the likelihood of
serious or fatal injury.
•
Unit must be properly anchored prior to use.
• Inspect product at regular intervals for
wear or loose hardware. Remove from
service if any abnormal conditions such as
cracks or breaks exist. Failure to perform
periodic checks could cause the anchored
product to overturn or cause a fall.
• Anchors must be used on level ground.
• Anchors must be installed entirely below
ground level to prevent children from
tripping.
SAFETY
CLEARANCE
ZONES
Orient the unit in the area intended for the installation.
CAUTION: Ensure that at least 6' (2 m) of clear,
unobstructed space surrounds the unit in every
direction. The safety
“use” zone must be free of all
obstacles such as: trees, posts, fences, buildings,
curbs, structures, etc.
TOTAL minimum space required 18' (5.5 m) x 24'
(7.3 m).
Once the 6' (2 m) safety “use” zone and
84" (2.15 m) overhead zone have been
established, mark the anchor areas as
shown above. Mark holes as close to the
unit as possible near the anchor cabling
holes in the climber. Carefully move the unit
away from the marked holes and proceed
to “Anchoring the Unit” section.
MARKING
ANCHOR
HOLES
18' (5.5 m)
minimum
24' (7.3 m)
minimum