English Page 19
Site requirements
• Suspend the motor unit with boom in such a way that the upper door edge lies approx.
10 mm below the horizontal downward border of boom - measured from the highest point
of the opening course (see points 7, 8, and 9).
• Attachment to the ceiling is made according to site requirements.
(Please mind the indications of measurements for dowel drilling).
O
11
O
10
Suspension of motor unit:
• Fix 1 support plate (A) in front of motor unit (see pictures 10 and 11).
• Bend it according to the site requirements.
Suspension of boom:
• Push 1 support plate (A) through suspension cramp (B) and bend projecting parts
(see picture 10).
• For positioning of boom suspension see picture 11.
O
12
• Screw the angle plates to the adapter arm using two screws M6 x 10 and hexagon nuts.
• Insert linking bar (G) with bolts (J) into the carriage (F) and fix with 2 screws. - Open door
fully,
• Connect linking bar with adapter arm (C).
• Observe the indicated measurements.
While lowering the boom and by extending the linking bar the door opening is enlarged.
The linking bar may only be extended so far that the inner pressure rolls (H) do not touch the
limiting screws (I).
Installation of bulb
• Turn in bulb E 14, (max. 40 W)
• Clip in cover of lamp and
• fix with securing screw.
After receiving an impulse, the bulb is glowing for approx. 3 min.
Attention:
Before changing bulb it is necessary to disconnect power supply line.
Bulbs are not covered by warranty.