English Page 11
D. Installation
GB GB
• Connect two door link brackets (B) to the door connector (C).
• Screw this to the centre of the upper edge of the door leaf using 4 screws
(drill ø 5 mm).
• Insert the door link (D) together with the bolt (F) into the carriage (E).
• Fix it with 2 screws.
• Connect the door link and the door link bracket.
Advice!
Remove the door locks or put them out of function!
Garage door operator with sectional door
• Screw the lintel joining plate (A) with boom to the lintel or ceiling, so that
the upper lamella of the door lies approx. 10 mm below the horizontal
downward boom edge - measured from the highest point of the opening
course (see as well point 3).
• Put the motor unit on a trestle or another suitable object until it is fixed later
to the ceiling.
• Join two door link brackets (B) to the door connector (C).
• Screw this to the centre of the upper edge of the door leaf using 4 screws
(drill ø 5 mm).
If necessary, the motor unit can be installed 200 mm off-centre.
• For wooden sectional doors please use wood-screws Ø 5 x 35 mm (drill ø 3 mm).
• Turn two self-tapping screws (D) so far into the door connector, until the
points of the screws are in front of the lamella.
9