742808
6
Zoom out
Zoom in
Vorherige Seite
1/52
Nächste Seite
6
EN
4 - PRODUCT INSTALLATION
Before starting the installation, make sure that the product is intact
and that the packaging contains all the components shown.
Make sure that the mounting area is compatible with the overall
dimensions (Fig.1).
Check the allowed use limitation in the diagram in Fig.2
Fig.3 is an example of a typical system:
- Operators (1)
- Photocells (2)
- Posts for photocells (3)
- Flashing light with integrated aerial (4)
- Key or digital switch (5)
Positioning the foundation box and the lever control and blo-
cking system
Depending on the dimensions, dig a suitably sized foundation ditch
(it is recommended to provide adequate drainage in order to avoid
water pooling).
Place the foundation box inside the trench, with the support pivot
aligned with the hinge axis.
Install a conduit for the electrical cables, and another for drainage.
Embed the foundation box in concrete, ensuring it is level and plumb
(Fig.4)
Ensure that the concrete used is prop-erly cured prior to pro-
ceeding with the following steps.
Insert the ball E into the special hole after having greased it.
Insert the control rod A over the foundation box sup-porting pivot B.
Always connect the earth cable to the mains power earth system with a cable minimum cross sectional area of 1.5 mm
2
Fix with a strong welding the wing of the gate on the release lever C,
then put everything on the driving bracket A.
Grease the mechanism using the appropriate grease nipple D
(Fig.4a).
Installing the gear motor
Place the motor reducer gear unit inside the foundation box.
Fix the motor reducer in place inside the foundation box by tighte-
ning the 4 nuts (Fig.5).
Assemble the lever engine (1) on the motor shaft and tighten the
screw (2).
Connect the lever engine (1) command to the bracket (3) through
the lever (4) (Fig.5a).
Connect the motor to the control panel following the instructions in
the manual installation of the card.
Installation of the limit switches in closing
Move the gate in a position fully closed, then adjust and fasten the
screw (Fig. 6).
Installation of the limit switches in opening
Place the gate in the maximum open position, and then then adjust
and fasten the screw (Fig. 6a).
4.2 - Electrical connections
UN24 UN24E
COLOR CABLE RIGHT LEFT RIGHT LEFT
Blue Opening Closing Opening Closing
Brown Closing Opening Closing Opening
Black - - + Encoder
Yellow / Green - - S Encoder
Grey - - - Encoder
In the case of a power failure, the gate can be unblocked mechanically by operating the motor.
Insert the supplied unlocking key and rotate completely the handle (above 90°) (Fig. 8).
To lock back follow the reverse procedure.
4.3 - Emergency unblocking
The automation system must be equipped with a pressure-sen-
sitive edge protecting all possible crushing points (hands, feet,
etc.) in accordance with the requirements of the EN 13241-1
standard.
Your gate shall be equipped with central and side stops, which
are fundamental for the good system operation. (Fig 7).
They shall state that the installer shall check that the tempera-
ture range marked on the drive is suitable for the location.
4.1 - Installation
ATTENTION !
ATTENTION !
ATTENTION !
ATTENTION !
ATTENTION !
6

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Marantec Comfort UN24 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info