PELLET STOVES Chapter 2
INSTALLATION AND USE MANUAL
page 11
Theoretical notion for installation Technical service - Rights reserved MCZ GROUP S.p.A. - Reproduction prohibited
MCZ strongly recommends using certified fuel in its
stoves (DINplus e Ö-Norm M7135).
The use of fuel of inferior quality or not conforming
to the specification given above compromises the
running of your stove and can therefore lead to the
termination of the guarantee and of the
manufacturer's responsibility for the product.
MCZ pellet stoves run exclusively on pellets with a
diameter of 6 mm (only for Italy) and 6-8 mm
(European countries) with lengths that go from 5
mm to 30 mm.
2.2. PRECAUTIONS FOR INSTALLATION
IMPORTANT!
Installation and assembly of the stove must be
carried out by qualified personnel.
The stove must be installed in a suitable position to allow the normal
operations of opening and ordinary maintenance.
The site must be:
capable of providing the environmental conditions for operation
equipped with power supply 230V 50 Hz
capable of taking an adequate system for smoke discharge
provided with external ventilation
provided with an earth connection complying with CE
The stove must be connected to a flue pipe or an internal or
external vertical duct conforming to current standards UNI
7129 - 7131 9615.
The stove must be positioned in such a way that the electrical
plug is accessible.
IMPORTANT!
The stove must be connected to a flue pipe or a
vertical duct which can discharge the fumes at the
highest point of the building.
The fumes are however derived from the combustion
of wood products, and if they come into contact with
or close to walls, they can make dirty marks.
Also take care because the fumes are very hot but
almost invisible, and can cause burns on contact.
The holes for the passage of the smoke pipe and for
the intake of air from outside should be made before
positioning the stove unit.