PELLET STOVES Chapter 3
INSTALLATION AND USE MANUAL
page 15
Installation and assembly Technical service - Rights reserved MCZ GROUP S.p.A. - Reproduction prohibited
2.10. PLUMBING CONNECTION
IMPORTANT!
The connection of the stove to the plumbing system
must be carried out ONLY by specialized personnel
who are capable of carrying out installation properly,
in compliance with current standards in the country
of installation.
If installation of the stove will involve interaction
with another, pre-existing system complete with
heating equipment (gas boiler, methane boiler, fuel
oil boiler, etc.), it is even more advisable to call in
qualified personnel, who subsequently will be
responsible for conformity of the system with current
applicable law.
MCZ will not be held responsible for damage to
persons or things in the event of failed or incorrect
operation if the aforementioned warnings are not
complied with.
For connection of the plumbing system to the stove, the user should
refer to chapter 3, INSTALLATION AND ASSEMBLY; specifically,
paragraph 3.4, CONNECTION TO PLUMBING SYSTEM