SECTION 7 - ROuTINE SERvICINg INSTRuCTIONS
7.1
SERVICING SCHEDULE
Fortheverylatestcopyofliteratureforspecication,maintenancepracticesandpartsreplacement,visitourwebsitewww.morcoproducts.co.uk
where you will be able to download the relevant information.
WARNING. Always turn OFF the gas supply at the gas service cock, and switch OFF and disconnect the electricity supply to
the appliance before servicing.
Combustion testing must be carried out by a competent person using a combustion analyser conforming to BS7927.
Toensurethecontinuedsafeandefcientoperationoftheapplianceitisrecommendedthatitischeckedatregularintervalsand
serviced as necessary. The frequency of servicing will depend upon the installation condition and usage but should be carried out at
least annually.
ItisthelawthatanyserviceworkmustbecarriedoutbyaGasSafeRegisteredEngineer,orinothercountriesaqualiedand
competent Gas Installer.
INSPECTION
1. Light the boiler and carry out a pre-service check, noting any
operational faults.
2.Checktheueterminal(andterminalguardiftted)is
undamaged and clear of any obstruction.
3. Check all water and gas joints for signs of leakage. Remake
any suspect joints ensuring a gas tightness check is carried
outifapplicableandthewatersystemiscorrectlyrelled,
vented and re-pressurised.
CLEANING PROCEDURE
Note. In order to carry out either servicing or replacement of
components the boiler upper and lower front panels must
be removed. Refer to Frame 7.2.
1. Clean the main burner. Refer to Frame 7.4.
2. Cleantheheatexchanger&condensatetrap/siphon.Referto
Frames7.5&7.6.
3.
Check the main injector for blockage or damage. Refer to
Frame 7.3.
4. Checkthattheueterminalisunobstructedandthattheue
system is sealed correctly.
The cleaning procedures are covered more fully in Frames 7.3-7.7
and MUST be carried out in sequence.
IMPORTANT.
5. After completing the servicing or exchange of components
always test for gas tightness.
6. When work is complete the front panels MUST be correctly
retted,ensuringthatagoodsealismade.
Do NOT OPERATE the boiler if the upper front
panel is not tted.
7. If, for any reason, the condensate trap/siphon has been
removedensurethetrapisrelledwithwaterbefore
reassembling.
8. Check the gas consumption if on metered installations.
9.
Checkcombustionbyconnectingtheuegasanalysertothe
uegassamplingpointasshowninthediagramandmeasure
CO&CO
2
.
If the CO/CO
2
ratio is greater than 0.004 AND the integrity of
thecompleteuesystemandcombustioncircuitsealshave
beenveriedandtheinletgaspressurehavebeenveried,
then contact Morco.
Flue Sampling Point
Air Sample
Point
Ensure all caps and seals
are re-fitted after use
GENERAL
Please Note: During routine servicing, and after any maintenance
or change of part of the combustion circuit, the following must be
checked:
- Theintegrityoftheuesystemandtheueseals,
- The integrity of the boiler combustion circuit and the relevant seals
- The operational (working) gas inlet pressure at maximum rate.
Turn on one or more DHW taps.
- The combustion performance.
COMPETENCE TO CARRY OUT THE CHECK OF
COMBUSTION PERFORMANCE
Please Note: BS6798:2009Specicationforinstallationand
maintenanceofgas-redboilersofratedinputnotexceeding70kW
net advises that:
- The person carrying out a combustion measurement should have
beenassessedascompetentintheuseofauegasanalyserand
the interpretation of the results.
- Theuegasanalyserusedshouldbeonemeetingthe
requirements of BS7927 or BS-EN50379-3 and be calibrated in
accordance with the analyser manufacturers requirements, and
- Competence can be demonstrated, for example, by satisfactory
completion of the CPA1 ACS assessment (UK Only), which
covers the use of electronic portable combustion gas analysers in
accordance with BS7967, Parts 1 to 4.
SERVICE MODE
To access the service mode:
Using the central heating potentiometer, starting from the 11 o’clock
position, move the thumb piece to the maximum position, back to the
11o’clockpositionandthennallynishatthemaximumposition.
The letter “S” will now be displayed.
To toggle to maximum DHW output move the thumb piece up to
the 11 o’clock position and then back to maximum. A minimum of 3
seconds will reset the boiler back to normal mode.
25

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln
1

Forum

morco-gb24

Suche zurücksetzen

  • Hallo. Wir haben eine GB 24. obwohl wir die Urzeit und alles eingestellt haben springt die Heizung nicht von alleine an morgens. Wir müssen immer das bedienteil an der Wand von Hand betätigen und die Heizung anzustellen. Woran kann das liegen? Und auch die Temperatur im Raum ist so tief da müsste sie doch automatisch anspringen. Danke schonmal Eingereicht am 25-3-2024 07:55

    Antworten Frage melden
  • warum bekomme ich keine deutsche Bedienungs -und Installationsanleitung ? Eingereicht am 23-1-2022 14:31

    Antworten Frage melden

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Morco GB24 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Morco GB24

Morco GB24 Bedienungsanleitung - Englisch - 8 seiten

Morco GB24 Bedienungsanleitung - Holländisch - 10 seiten

Morco GB24 Bedienungsanleitung - Französisch - 10 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info