The instructions for installation, operating and maintenance must be kept in a safe place as long as the door is in use!
- 2 -
pointing to the left inside garage wall [
1.30aa
]. Screw the
other deflection pulley cable assembly 11 with the red side
showing upwards to the other triple extension spring
assembly 12 with S5
+ S12.This is the left spring
assembly. Both cable ends are pointing to the right
inside garage wall [
1.30ab
].
( 11 ) Insert the right and left spring assemblies into the right and
left spring channel 8 and hang in the first
hole of the spring
tightening strap in the spring hooks on the corner
connection brackets 20
R/L
and secure with spring
connectors 15 [
1.30b
].
( 12 ) Mount springs
( 12a ) Insert the ends of the double steel cables 12 into
the upper rope fixation 5[
1.30c
]. Make sure the
double steel cables 12 are not twisted.
( 12b ) Insert the other end of the double steel cables 12 (
it clamp 2 cable) into the upper hole from the angular
frames 1
L/R
[
1.30c
].
( 12c ) Lift up the pairs of horizontal tracks 14
R/L
and
secure them against falling down (Make sure the
track connector 6 is safely supported). Make sure
rhe double cables 12 are in the angular frames 1
L
.
( 12d ) Screw the cable deflection pulley 17 on the head
angle from the angular frames 1
L
2 x S11 [
1.30d
].
( 12e ) Pull out the double steel cables 12 of the angular
frames 1
L
and lead it over the cable deflection pulley
17, than fix it and screw the rope unwind security 18
and the cable deflection pulley 17 with S3 [
1.30e
].
( 12f ) Mounting the mesh protection 97
R/L
on the upper
rope fixation 5 and the cable deflection pulley 17 with
S11 [
1.30e
].
( 13 ) Screw track bends 30 with S6 + S12 to the angular frame
1
R/L
and with S6 + S12 to the front suspension brackets 8
(make sure the transition between the track profiles is
straight) [
1.35a
].
( 14 ) Level out the track connectors 6 and the pairs of horizontal
tracks 14
R/L
using a water level and loosely screw to the
wall/ceiling
[
1.35 f
]
.
( 14a ) Wall mounting: pull connecting brackets 28 and
dowel with S8
+ S9 [
1.35b
].
( 14b ) Ceiling mounting: screw together an anchor track
27, connecting bracket 28 and clamping plate 29
and dowel with S8
+ S9 [
1.35c
].
( 14c ) Screw an additional anchor track 27 to the
suspension bracket 8 with S6
+ S12 and dowel with
the connection bracket on the ceiling 28 + S8 + S9.
If necessary, shorten the anchor tracks 27
depending on the height of the ceiling [
1.35d
].
If necessary a additional ancor track 27 on the
forehold spring channel bracket 8 you must be notch
the anchor track 27 because the shearing point
[
1.35e
].
Mounting of door leaf (top section is positioned in the section
packet on top)
( 15 ) Floor section
( 15a ) Screw the floor profile 47 with S10 to the floor
section 44 (leave the outer holes free) and insert
rubber stoppers 45
R/L
[
1.40a
]. Notch protective foil at
one end and remove carefully [
1.40ba, bb
].
( 15b ) Place the floor section 44 between the angular
frames 1
R/L
and put a 3 cm-thick piece of wood (or
something similar) underneath it so that later the
door can be lifted. Secure the floor section 44 so that
it cannot fall over [
1.40
].
( 15c ) Pull out roller 56 from side hinge 48
R/L
with pre-
installed roller holder 61, stick the roller 56 in the
other side of the roller holder 61 and mount the side
hinge 48
R/L
on the floor section 44 with S10 [
1.40c,d
].
( 15d ) Pull out roller 56 from lower cable mounts 57
R/L
with pre-installed roller holder 61 ( by operator: place
one shims each on the axles) stick the roller 56 in
the other side of the roller holder 61 and mount the
lower cable mounts 57
R/L
on the floor section 44 with
4 x S10 [
1.40e,f
].
( 15e ) For the subsequent assembly turn up the cable
hang on roller holder 61 [
1.40g
].
( 16 ) Lock section [
1.45
]
( 16a ) Place the lock section 67 between the angular
frames 1
R/L
and secure it so that it cannot fall over
and screw side hinges 48
R/L
as with the floor section
44 S10 [
1.45a
].
( 16b ) Screw middle hinges 68 on lock section 67 and
connect with the floor section 44 S10
[
1.45b
].
( 16c ) Press clip 69 into the matching recess on the
outside handle 70 with the long square neck [
1.45d
].
( 16d ) Mount the lock set to the lock section 67 as
depicted diagramm
[
1.45d
]: Insert the handle plate 72
to the cover plate 71 from the outside into the
rectangular hole of the lock section 67 and screw to
the lock set 73 + 76 + S1
insert the outside handle
70 through the square hole of the cover plate 73
(right-angle bend pointing up) and screw (with iso9-
2: clamp distance frame 75 in between) to the inside
handle 78 from the inside using S2. Note: the lever
arm 77 (zinc diecasting) must point upwards to the
right.
For doors without operator:
( 16e ) Fix slide reacting bolt 79 on lock section 67 S10
[
1.45 e
]
.
( 16f ) Keep the locking bar 80 between the slide reaction
bolt 79 and the lock and if it is nessesary cut it with
the metal saw
[
1.45 c
].
( 16g ) Use the locking bar 80 with the lever arm and the
slide reacting bolt 79 and fix it S4
[
1.45 e
].
( 17 ) Middle section(s) [
1.50
]
Screw middle sections analogously to floor/lock section
with hinges 48
R/L
+ 68, insert into the angular frame 1
R/L
and mount the rollers 56.
( 18 ) Top section [
1.50
]
( 18a ) Mount the upper roller block 90
R/L
with the upper
roller holder 88
R/L
S5 + S12 [
1.50aa
].
( 18b ) For NovoPort you have to dismantle the external
ring of the upper roller on the side of the operator.
Take the upper roller in the left hand and place the
screwdriver between the rip and the tooth of the
roller. Turn the roller to the right and loosen and
remove the external ring [
1.50ab
].
( 18c ) Place the top section 87 between the angular
frames 1
R/L
and secure it so that it cannot fall over
and screw upper roller block 90
R/L
. Screw middle
hinges 68 on top and middle section with S10 [
1.50b
].
( 19 ) Adjusting the rollers:
( 19a ) Pull all roller holder out from door leaf in the
direction indicated by the arrow so that the door leaf
sits close on the frame seal (space between section
skirt from grey segment of frame seal: approx. 1
mm). Rollers should turn easily by hand.
10

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Novoferm iso 20-2 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Novoferm iso 20-2

Novoferm iso 20-2 Zusatzinformation - Alle Sprachen - 18 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info