805747
13
Zoom out
Zoom in
Vorherige Seite
1/88
Nächste Seite
Danger
It is forbidden to store, even temporarily, combustible products
and substances in the boiler or near the boiler.
Warning
Fix the appliance to a solid wall capable of bearing the weight of
the boiler when full of water and fully equipped.
Do not place the appliance above a heat source or a cooking
appliance.
Do not locate the boiler in direct or indirect sunlight.
Caution
The boiler must be installed in a frost-free area.
An earthed electrical connection must be available close to the
boiler.
A connection to the drain must be present for the condensate
drain close to the boiler.
4.3 Requirements for water connections
Before installation, check that the connections meet the set
requirements.
Carry out any welding work required at a safe distance from the boiler.
If using synthetic pipes, follow the manufacturer's instructions.
4.3.1 Requirements for CH water connections
When fitting service shut-off valves, position the filling and drain valve,
the expansion vessel and the safety valve between the shut-off valve
and the boiler.
Carry out any welding work required at a safe distance from the boiler or
before the boiler is fitted.
For filling and tapping the boiler, install a filling and drain valve in the
system, preferably in the return.
Install an expansion vessel in the return pipe.
When installing open-vented systems, the cold feed and expansion tank
heights must comply with the requirements laid down in the Health and
Safety Executive publication PM5. The Quinta Ace boilers require a
minimum static height of 3 m (Quinta Ace 30/45/55/65/90 or 5 m ( 115).
4.3.2 Requirements for condensate drain line
The siphon must always be filled with water. This prevents flue gases
from entering the room.
Never seal the condensate drain.
The drain pipe must slope down at least 30 mm per metre, the maximum
horizontal length is 5 metres.
Condensed water must not be discharged into a gutter.
4.3.3 Flushing the system
The installation must be cleaned and flushed in accordance with BS 7593
(2019) and BSRIA BG 33/2014.
Before a new boiler can be connected to a system, the entire system must
be thoroughly cleaned by flushing it. The flushing will remove residue from
the installation process (weld slag, fixing products etc.) and accumulations
of dirt (silt, mud etc.)
Important
Flush the heating system with a volume of water equivalent to at
least three times the volume of the system.
Flush the domestic hot water pipes with at least 20 times the
volume of the pipes.
4 Preparation of installation
7684359 - v.11 - 13122021 13
13

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Remeha Quinta Ace 55 - T-Control wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info