587909
5
Zoom out
Zoom in
Vorherige Seite
1/44
Nächste Seite
5
Installation of the unit
Area of application
REMKO GPM series gas wall
heaters are used for heating small
areas such as workshops up to
large areas such as industrial halls,
sports facilities, etc.
For economical heating, correct
calculation of the heat demand for
the required heat output for the
room is essential.
General preconditions
For installation of the units,
the local and country-specifi c
regulations and directives in the
latest version must generally be
observed.
The following work such as:
gas and electrical installation
change of gas type
commissioning
adjustment or maintenance
must only be carried out by
qualifi ed specialists.
In addition to perfect electrical gas
installation, this ensures that all
necessary measurements and tests
are also carried out.
The units must be tested at
least once a year by authorised
specialists.
The units can constitute a hazard
if not installed and operated
correctly. Prior to planning and
installation of the units, the
following must be observed
The units must be installed and
operated so that there is no risk
to persons due to exhaust fumes
and radiated heat and fi res
cannot occur
For installation of the units,
it must be ensured that the
discharging hot air has no
damaging effects on the
environment
Fire hazards must be prevented
depending on the materials of
the installation and mounting
surfaces. See TRGI, Section
5.1.3.3
Wall or ceilings intended for
mounting purposes must consist
of fl ame retardant materials.
Their load-bearing capacity must
be verifi ed, reinforcements must
be provided if necessary
Brackets must be securely
anchored to walls or ceilings and
the units fastened to the same
at the points provided at the
factory
Adequate maintenance options
for the heat exchanger, burner,
fan and chimney duct must be
provided
Operating devices for the unit
and fuel supply must be able to
be operated from ground level.
Maintenance and repair options
must be provided by the
operator
It is recommended to conclude
a maintenance agreement with
the specialised company for this
purpose
For planning and installation of
the chimney duct, the structural
possibilities and pertinent local
and country-specifi c regulations
must always be observed
In environments subject to
heavy fouling, cleaning and
maintenance must be carried
out depending on the respective
conditions.
In these cases, the combustion
air must always be supplied
from the outside
Selecting the site of
installation
For selecting the site of installation,
account must be taken of the
requirements with respect to:
Fire protection and operational
risk
Function:
Room heating, low pressure
and excess pressure in the
installation room, etc
Operating requirements,
heat demand, nominal air
volume fl ow, circulation air
requirements, humidity, room
temperature, air distribution,
space requirement
Mounting, repair and
maintenance options.
The units must be mounted so
that they are easily accessible
at all times for repairs and
maintenance
The units must not be installed
in rooms with an explosive or
corrosive atmosphere!
ATTENTION
5

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für REMKO GPM 75 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von REMKO GPM 75

REMKO GPM 75 Bedienungsanleitung - Deutsch - 44 seiten

REMKO GPM 75 Bedienungsanleitung - Holländisch - 44 seiten

REMKO GPM 75 Bedienungsanleitung - Französisch - 44 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info