587703
20
Zoom out
Zoom in
Vorherige Seite
1/32
Nächste Seite
10
Slope of the condensation line
at least
2% slope
The condensation hose is designed
to be installed on the left side
(viewed from the front).
All electrical installation
work is to be performed
by specialty companies.
Disconnect the voltage supply
when connecting the electrical
terminals.
ATTENTION
Monitoring for leaks
Once all the connections have
been established, the pressure
gauge station is attached as
follows to the Schrader valve (if
fitted):
red = small valve
= injection pressure
blue = large valve
= suction pressure
Once connected, perform a leak
test using dry nitrogen.
The tightness test involves
spraying a leak detection spray
onto the connections. If bubbles
are visible, the connections have
not been properly made. Tighten
the connection or prepare a new
flange.
If the leak test is successful,
depressurise the refrigerant lines
and start a vacuum pump with an
absolute final partial pressure of
min. 10 mbar to create a vacuum
in the lines. Any moisture present
in the pipes will also be removed.
A vacuum of min. 20 mbar
must be created!
ATTENTION
The time required to generate
the vacuum is dependent on the
pipework volume
of the indoor unit and the length
of the refrigerant lines. The
process will always take at least
60 minutes.
Once any foreign gases and
moisture have been completely
extracted from the system, the
valves on the pressure gauge
station will be closed and the
valves on the outdoor component
will be opened as described in the
chapter on "Commissioning".
Condensate connection
Due to undercutting of the
dew point at the vaporiser,
condensation forms during
coolingand in the condenser
duringheating.
Below the vaporiser is a collection
tray, which must be connected to
a drain.
The lower section of the outdoor
component's housing is designed
to serve as a collection tray. The
condensate connection included
in the scope of delivery is to be
attached here.
The condensation line is to
be installed with a minimum
slope of 2 %. (figure 10).
If necessary, fit vapour diffusion
tight insulation.
Lead the condensation line
freely to the run-off line. If
the condensation runs directly
into a sewer pipe, fit a trap to
prevent any unpleasant odours.
When operating the unit at
outdoor temperatures below
+4 °C, make sure to route
the condensation to prevent
freezing. The lower part of the
housing is also to be kept frost
free by the user, in order to
ensure permanent draining of
the condensate.
If necessary, fit supplementary
pipe heating.
After completed installation,
check for unobstructed
condensation run off and
ensure that a permanent seal is
provided.
Electrical connection
A mains cable must be installed as
voltage supply to the Indoor unit
and a control cable to the outdoor
unit, with appropriate safeguards.
We recommend that a mains/
repair switch be installed near
the outdoor component.
If an optionally available
condensation pump is used
on the unit, then an additional
relay for the shut-off contact
of the pump will be needed to
increase the switching power to
shut off the compressor.
Control cables should be
screened if laid in areas exposed
to strong magnetic fields.
Electrical protection
is provided in accordance with
the technical data.
REMKO ML...DC - ARCTIC
20
20

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für REMKO ML522 DC wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von REMKO ML522 DC

REMKO ML522 DC Bedienungsanleitung - Deutsch - 32 seiten

REMKO ML522 DC Bedienungsanleitung - Deutsch - 32 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info