COMMISSIONING
The commissioning and first firing of the boiler must
only be done by a competent person.
Gas installation
It is recommended that any air is purged from the
supply at the gas inlet test point on the lower right
hand side of the gas valve, see diagram 15.
Filling the system
Open shut off valves, see diagram 5 (slot of screw
corresponds to flow direction), and caps on auto-
matic air vents on top of pump and top right hand
side of boiler.
Bleed each radiator until a continuos jet of wa-
ter is obtained.
Do not close automatic air vent caps on boiler.
Open various hot water taps to bleed system.
Make sure that pressure gauge reads between
1 and 2 bar. Re-pressurise system as necessary.
Important:
- If this procedure is not carried out properly, the
boiler will go into safety lock-out until all of the air
has been purged.
- When venting air from boiler, do not touch the
schrader valve on the expansion vessel, it is NOT a
vent.
Starting the boiler
Before starting the boiler check that:
- The gas meter tap is open.
- The boiler gas service cock is open.
- The boiler is connected to the electrical supply.
First starting up
Following the instructions given in the 'Controls
and Lighting' section, set boiler to run in central
heating mode.
Set boiler thermostat for maximum temperature
and check that any external controls, if fitted, are
calling for heat.
Allow the temperature to rise to the maximum
value, with all radiator valves open.
The temperature rise will cause release of the gases
contained in the water of central heating system.
- Gases driven towards the boiler will be automati-
cally released through the automatic air vents.
- The gases trapped at the highest point of the sys-
tem must be released by bleeding the radiators.
On reaching maximum temperature, the boiler
should be turned off and the system drained as
rapidly as possible whilst still hot.
Refill system to a pressure of 1 bar and vent as
before.
Restart boiler and operate until a maximum tem-
perature is reached. Shut down boiler and vent
heating system. If necessary, top up heating sys-
tem and make sure that a pressure of 1 bar is indi-
cated on the pressure gauge when system is COLD.
Gas pressures
The main burner pressure should be checked dur-
ing commissioning to make sure the correct input
is obtained. Proceed as follows:
Shut down boiler.
Diagram 15
Ins 009
Diagram 16
Gas inlet
test point
Connect the pressure gauge to MP and
RMP
MP = measuring point
RMP = reference measuring point
pressure gauge
Ins 006
Undo screws on burner pressure test points RMP
and MP below sealed combustion chamber, see
diagram 16.
Connect a suitable pressure gauge.
Gain access to the rear of the control panel and
locate the range rating adjuster screw, see dia-
gram 17.
Start boiler as described in 'Instruction for Use'.
Set OFF/Summer/Winter switch to 'Winter' (Heat-
ing and hot water ) position.
13

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Saunier Duval Thelia 30 e wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info