GB
18
Installation
Mounting the hood - Diagram 1
• Using a pencil draw a vertical line on the wall
corresponding to the centre line of the cooker hood
installation area (1).
• Position the template for wall mounting (2) the lower
template border corresponds to the
lower border of the cooker hood, the
printed centre line on the template must
correspond to the one traced on the
wall.
• Affix the bracket with two Ø8mm dowels
and two 5x45 screws (3).
• Attach the cooker hood (4).
• Adjust the cooker hood position with the
screws on the cooker hood clasp (5-6).
• Remove the grease filters and mark the
two permanent drill holes on the wall
from inside the cooker hood (7).
• Re-attach the cooker hood (9) and
affix permanently with the two 5x45
screws (10).
• Using the upper bracket for flue
supports drill two holes and insert two
Ø8mm dowels (11) and affix the upper
bracket with two 5x45 screws (12).
• According to the version used:
External elimination version:
Affix the evacuation pipe firstly the upper
part towards the outside, then the lower
part on the cooker hood evacuation ring
(13 - pipe and pipe fixing clamps not
provided).
Recycle version:
Affix the deflector F to the flue bracket
with 4 screws.
Firstly affix the upper part of the
evacuation pipe on the deflector’s
connection ring, then the lower part on
the cooker hood evacuation ring
(13 - pipe and pipe fixing clamps not
provided).
• Connect the cooker hood to the
electrical mains (14).
• Affix the flue (15a) to the upper bracket
(15b) with two screws.
• Allow the lower part to slide and insert it
in the housing towards the bottom in
order to be able to affix the lower section of the flue
to the cooker hood with two screws (16).
• Remount the grease filters and check that the
cooker hood operates perfectly.
Diagram 1