22
Installation
08. Screw in the two lower hexagon head
cap screws.
ṇBefore the 4 screws are tightened
down, align the extractor hood properly.
12. Push both sections of the flue panelling
together (slots in the upper section
must be pointing downwards) and
insert into the opening in the extractor
hood.
ṇ Protect the cover panels from
scratches, for example by laying the
template used for marking the wall over
the top edge of the lower section.
09. Connect up the air outlet pipe.
10. Connect the hood to the electricity
supply.
11. Remove the protective film from the
two flue ducts.
ṇ Avoid damage to the sensitive
surface.
Warning: The interior walls of the flue
panelling can have sharp edges – Risk of
injury –.
We recommend that you wear gloves when
installing.
13. Slide out the upper section and attach
it to the mounting brackets at the sides
with two screws.