7
4”- 6” ELECTROSUBMERSIBLE PUMPS
Standard use
Well
arthesian depth DN100 mm (4”)
DN 150 mm ( 6”)
Liquid
clean water or lightly charged,
max. temperature 25ºc; sand
content 40 g/m
3
Service
continuos or intermittent max.20
starts/hour well distributed. Max.
voltage drop 3% on nominal data
voltage
Motor
4- 6” imerged, asychronous
bipolar,water cooled (flow 0,1
m/s), insulation B cl.(4) and
F(6),degree of protection IP
58.THREEPHASE with direct
star t (0,25/5,5kW)o star t-
delta or statoric start(>5,5kW);
SINGLEPHASE with capacitor
tart (0,25/2,2kW). To be coupled
according to NEMA standars.
FIRST CONTROL
• The well must be right,without sand or
sediment,if not provide to bleed it.
• Before plunging the group check the sense
of rotation of the motor: it must anticlockwise
looking from the shaft exit side. For water
cooled motors also control the topping-up the
liquid according to the motor manufacturer’s
instructions.
MOTOR COUPLING
• Check the free rotation of the motor-pump
and the cable condition, if not tted, block the
connector into its seat with a proper key (5
kgm). Clean the surfaces to be coupled.
• Keep out the suction screen and cable pro-
tection, put the suction head of the pump in
correspondance of the motor prisoners and
cable cross;couple the grooved joint of the
pump to the motor shaft then x it with nuts
as standard.
• Make sure that a clearance exists on pump
joint by using a screw-driver appealing to the
motor,reassemble the suction screen and
cable protection and insert the motor cable in
its own seat.
CABLE
CONNECTION
• Joint the motor cable to the line cable (10) with
high insulating systems(thermotightening or
dielectric resin).
• Choose the standart feeder(2) according
to: voltage-power-lenght-type of service
(insulation>1kW)
• When nishing the cable connection,before
pluging the electropump,verify the followings
by using suitable instruments:the CONTI-
NUITY among phases,between the earth
conductor and motor mass,the INSULATION
between phases and earth.
INSTALLATION
• Handle thee pump (12) carefully;don’t hurt it
and dont make it fall.Apply safety and accident
prevention rules in force in the building yards
when screwing pipings(9) and getting down
the group. Be careful to void overturnigs that
could hurt persons and plants.
Tighten the threads of the discharge pipings;
for safety purposes it is better to execute some
spot-weldings at the coupling level. With plastic
pipings use proper connections.
• Anchor the group with resistant,antioxidant
cables (8), suitable to bear the weight of the
machine with discharge pipings full of water.
• When getting down the pump,link the electrc
cables to the discharghe piping, x them with
plastic hose clamps(each 3mt),be careful: don’t
damege them and NEVER use them to uphold
the goup.
• If the diameter of the well is quite bigger than
the electropump, it is better to install another
jacket,external to the motor; this is to grant that
the cooling water speed is ≥0,1 m/s.
• Place the electropump keeping it away from
the bottom of the well (x); this is ti avoid a bad
cooling due to sediments; the dinamic level(A)
of the well must not inuence its work. Grant
electrical protections and automatic level con-
trols (3) to the installation.
• Always install, at least, one non-return valve (6)
at the surface to protect the pump against wa-
ter hammers due to the plant before the valve.
8

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Speroni SX wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info