813430
14
Zoom out
Zoom in
Vorherige Seite
1/16
Nächste Seite
14
COMMISSIONING AND HANDOVER
Ensure all parts are fitted in accordance with the instructions.
On completion of the installation allow a suitable period of time for any fire cement and mortar to dry out, before lighting the stove. Once the
appliance is operating check all seals for soundness and check that the flue is functioning correctly and that all products of combustion are
vented safely to atmosphere via the chimney terminal.
On completion of the installation and commissioning ensure that the operating instructions for the appliance are left with the customer.
Ensure to advise the customer on the correct usage and warn them to use only the recommended fuel for the appliance.
Advise the user what to do should smoke or fumes be emitted from the appliance.
The customer should be warned to use a fireguard to BS 8423:2002 in the presence of children, aged and/or infirm persons.
FLUE AND CHIMNEY
The flue or chimney system must be in good condition.
It must be inspected by a competent person and passed for use with the appliance before installation.
Products of combustion entering the room can cause serious health risks.
The following must be checked:
The construction of the masonry chimneys, flue block chimneys and connecting flue pipe system must meet the requirements of the
Building Regulations.
A flexible flue liner system can be used if certified for use with solid fuel systems and installation complies with manufacturer’s instructions
and Building Regulations.
The flue liner must be replaced when an appliance is replaced, unless proven to be recently installed and in good condition.
If it is necessary to fit a register plate it must conform to the Building Regulations.
The minimum height of the flue or chimney must be 4.5m from the hearth to the top of the flue, with no horizontal sections and a
maximum of 4 bends. Bends must have angles of less than 45 degrees from the vertical.
There should be at least 600mm of vertical flue pipe above the appliance before any bends are introduced.
Ensure the connecting flue pipe is kept a suitable distance from any combustible material and does not form part of the supporting
structure of the building.
The installer must ensure the flue pipe diameter is not less than the diameter of the outlet of the appliance and does not narrow to less
than the size of the outlet at any point in the system.
Make provision to remove the appliance without the need to dismantle the chimney.
Any existing flue must be confirmed as suitable for the new intended use as defined in the Building Regulations.
The flue or chimney systems must be inspected and swept to confirm the system is structurally sound and free from obstructions.
If the chimney is believed to have previously served an open fire it must be swept a second time within a month of regular use after
installation to clear any soot falls that may have occurred due to difference in combustion levels.
The flue exit from the building must comply with local building control rules.
Chimney heights and/or separations may need to be increased in particular cases where wind exposure, surrounding tall buildings, high
trees or high ground could have adverse effects on flue draught.
Do not connect or share the flue or chimney system with another heating appliance.
Do not connect to systems containing large voids or spaces over 230mm square.
Suitable access must be provided to enable the collection and removal of debris.
The flue must be swept and inspected when the appliance is installed.
Flue Draught
The flue draught must be checked with all windows and doors closed and any extraction fans in this, or adjoining rooms, running at maximum
speed.
14

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Stovax Elise wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Stovax Elise

Stovax Elise Installationsanweisung - Englisch - 40 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info