Technical Appendix
Legal Requirements
Before installation and/or use of this appliance please read these
instructions carefully to ensure that all requirements are fully
understood.
The appliance must be fitted by a registered installer, or
approved by your local building control officer.
It is very important to understand the requirements of the national
Building Regulations and standards, along with any local
regulations and working practices that may apply. Should any
conflict occur between these instructions and these regulations
then the regulations must apply.
Your local Building Control Office can advise regarding the
requirements of the regulations.
Works must be carried out with care to meet the requirements of
Health and Safety and comply with the Health and Safety rules,
and any new regulations introduced during the lifetime of these
instructions. Particular attention should be drawn to:
Handling: The appliance is heavy. Adequate facilities
must be available for loading, unloading and on site
handling.
Fire Cement: Some fire cement is caustic and must not
come into contact with the skin. Protective gloves must be
worn. Wash hands thoroughly with plenty of water after
contact with skin.
Asbestos: This appliance contains no asbestos. If there
is the possibility of disturbing any asbestos in the course of
installation seek specialist guidance and use appropriate
equipment.
Metal Parts: Take care when installing or servicing the
appliance to avoid personal injury.
A faulty installation can cause danger to the inhabitants and
structure of the building.
For users of this appliance:
Your building insurance company may require you to inform them
that a new heating appliance has been installed on your property.
Check that your cover is still valid after installing the appliance.
Flue Outlet Positions
150mm
max
Vertical
Measurement
Terminal
Insulation
Flue
Horizontal
Measurement
Adjacent
Building
The datum for vertical measurement is the point
of discharge of the flue from either the point of
discharge of the flue or 150mm above insulation,
whichever is the lower.
IMPORTANT: Seek specialist advice if
installing in a dwelling with a thatched roof
These positions are defined by Document J of the Building Regulations.
Adjacent Building
Point where the flue passes through weather surface
(Notes 1 & 2)
Clearances to flue outlet
A
At or within 600mm of the ridge At least 600mm above ridge
B
Elsewhere on roof (whether pitched or flat) At least 2300mm horizontally from the nearest point on the weather surface and:
a) at least 1000mm above highest point of intersection of the chimney and the weather surface; or
b) at least as high as the ridge
C
Below (on a pitched roof) or within 2300mm horizontally to
openable rooflight, dormer window, or other opening (Note
3)
At least 1000mm above the top of opening
D
Within 2300mm of an adjoining or adjacent building,
whether or not beyond the boundary (Note 3)
At least 600mm above any part of the adjacent of building within 2300mm
1) The weather surface is the building external surface, such as it's roof tiles or external walls.
2) A flat roof has a pitch less than 10°.
3) The clearance given for A or B, as appropriate, will also apply.
4) A vertical flue fixed to an outside wall should be treated as equivalent to an inside flue emerging at the nearest edge of the roof.
England and Wales – Document J / Scotland - Part
F/Document J (Republic of Ireland only)
the latest edition of BS 8303, BS EN 15287, BS 7566
*Registered on the Competent Persons Scheme
(GB only) see page 38/ INFO (Republic of Ireland).
35

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Stovax View 7 Inset High Output Boiler Inset wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info